NESO TEC REGISTER · GREAT BRITAIN

Grid connection projects in the connection queue on the National Grid (England & Wales) network

Every generator, battery and interconnector with an agreement to connect to the GB transmission network, from early scoping to built. Filter by technology, stage or network, and open a project for its connection details.

Projects shown1,329586.0 GW in total
In planning968scoping or awaiting consent
Consented or building149closest to connecting
Built212connected and operating

Map

Loading projects…

Voltage400 kV275 kV132 kVHVDCNew HVAC

ProjectsPlanningConsentedConstructionBuiltMajor project with its own page

Projects

1,329 projects · page 9 of 27
ProjectCapacityStageConnection siteFrom
Stable Green Energy
Battery storage · Lh Nget Grid Services Limited
500 MWScoping Sussex and Romney Connection Node A 400kV Substation
National Grid (England & Wales)
Oct 2037
Stallingborough PV & BESS Station
Solar + storage · Stallingborough Energy Project Limited
500 MWScoping Grimsby West 400kV Substation
National Grid (England & Wales)
Oct 2034
Sundon Storage
Battery storage · Statera Energy Limited
500 MWScoping Sundon 400kV Substation
National Grid (England & Wales)
Oct 2027
Sunnica
Solar + storage · Sunnica Limited
500 MWConsents Approved South Anglia Connection Node D 400kV Substation
National Grid (England & Wales)
Oct 2030
The Clean Future
Solar + storage · The Clean Future Renewables Limited
500 MWScoping Killingholme 400kV Substation
National Grid (England & Wales)
May 2033
The Droves (formerly Swaffham PV & BESS)
Solar + storage · The Droves Solar Farm Limited
500 MWScoping Swaffham 400KV Substation
National Grid (England & Wales)
Oct 2033
Thornton
Solar + storage · Igp Solar 19 Limited
500 MWScoping Thornton 400kV Substation
National Grid (England & Wales)
Oct 2031
Tillbridge Solar
Solar + storage · Tillbridge Solar Limited
500 MWScoping Cottam 400kV Substation
National Grid (England & Wales)
Aug 2028
West Oxfordshire Energy Park
Solar + storage · Low Carbon Solar Park 43 Limited
500 MWScoping Chiltern Connection Node D 400kV
National Grid (England & Wales)
Oct 2037
Wick Moor Drove
Solar + storage · Bsr Applications Limited
500 MWScoping West Country Connection Node D 400kV Substation
National Grid (England & Wales)
Oct 2037
Willington Energy Park
Solar + storage · Brockwell Storage & Solar Limited
500 MWScoping Willington 400kV Substation
National Grid (England & Wales)
Oct 2028
Bradwell Energy Park
Solar + storage · Low Carbon Solar Park 28 Limited
499 MWScoping Rayleigh 400kV Substation
National Grid (England & Wales)
Oct 2032
Burwell GEC (Ethos Green)
Solar + storage · Burwell Green Energy Centre Ltd
480 MWScoping Burwell 400kV Substation
National Grid (England & Wales)
Oct 2032
Bushbury Green Energy Centre
Solar + storage · Bushbury Green Ng Limited
480 MWScoping Bushbury 275kV Substation
National Grid (England & Wales)
Oct 2028
Butlers Energy Project
Solar + storage · Ig Renewables Spv 1 Ltd
480 MWScoping South Anglia Connection Node B 400kV Substation
National Grid (England & Wales)
Oct 2034
Daines Green Energy Centre
Solar + storage · Daines Green Ng Limited
480 MWScoping Daines 400kV Substation
National Grid (England & Wales)
Oct 2030
EPL Hampshire
Solar + storage · Epl Newco7 Limited
480 MWScoping Nursling 400kV Substation
National Grid (England & Wales)
Oct 2037
EPL Somerset
Solar + storage · Epl Newco8 Limited
480 MWScoping West Country Connection Node E 400kV Substation
National Grid (England & Wales)
Oct 2037
EPL Suffolk
Solar + storage · Epl Newco9 Limited
480 MWScoping North Anglia Connection Node E 400kV Substation
National Grid (England & Wales)
Oct 2034
Gresham House Rayleigh BESS
Battery storage · Rayleigh Storage Limited
480 MWScoping Rayleigh 400kV Substation
National Grid (England & Wales)
Jun 2028
Melkshem (Cartridge Farm)
Battery storage · Queequeg Renewables Ltd
480 MWAwaiting Consents Melksham 400kV Substation
National Grid (England & Wales)
Oct 2037
Morecambe Offshore Wind Farm
Offshore wind · Morecambe Offshore Windfarm Ltd
480 MWScoping Penwortham 400kV Substation
National Grid (England & Wales)
Jun 2029
Moreton Estate
Solar + storage · Epl Newco5 Limited
480 MWScoping Chickerell B 400kV Substation
National Grid (England & Wales)
Apr 2037
Noventum - Astwood
Solar + storage · Noventum Power Solar 12 Limited
480 MWScoping West Anglia Connection Node C 400kV Substation
National Grid (England & Wales)
Oct 2034
Pamber Farm
Battery storage · Queequeg Renewables Ltd
480 MWAwaiting Consents Bramley
National Grid (England & Wales)
Oct 2037
Pelham GEC (Ethos Green)
Battery storage · Pelham Green Energy Centre Ltd
480 MWAwaiting Consents Pelham 400kV Substation
National Grid (England & Wales)
May 2035
Spalding PV and BESS Station
Solar + storage · ETP UK 1 LTD
480 MWScoping Weston Marsh 400kV Substation
National Grid (England & Wales)
Jul 2033
Upper College Farm BESS
Battery storage · Bluestone Energy Ltd
480 MWScoping North Kent Connection Node C 132Kv Substation
National Grid (England & Wales)
Oct 2037
Wakeleys BESS
Solar + storage · Epl Newco6 Limited
480 MWScoping Wakeleys 400kV
National Grid (England & Wales)
Oct 2033
West Burton Solar Project
Solar + storage · West Burton Solar Project Limited
480 MWConsents Approved West Burton 400kV Substation
National Grid (England & Wales)
Oct 2028
Worksop BESS
Battery storage · ARM Cedar Limited
480 MWScoping Trent Valley South Connection Node B 400kV Substation
National Grid (England & Wales)
Oct 2034
Noventum -Long Stratton
Solar + storage · Noventum Power Solar 8 Limited
460 MWScoping North Anglia Connection Node A 400kV
National Grid (England & Wales)
Oct 2034
Shoreham
Gas · VPI Power Limited
460 MWBuilt Bolney 400kV Substation
National Grid (England & Wales)
Alderton PV & BESS Station
Solar + storage · Bnrg Albion Limited
450 MWScoping East Claydon 400kV Substation
National Grid (England & Wales)
Oct 2037
Blyth BESS
Battery storage · Sse Renewables Solar & Battery Holdings Limited
450 MWScoping Blyth 275kV Substation
National Grid (England & Wales)
Oct 2036
Gateway Energy Centre Power Station
Battery storage · Gateway Energy Centre Limited
450 MWConsents Approved Coryton South 400kV Substation
National Grid (England & Wales)
Jun 2029
JG Pears
Solar + storage · Jg Pears Grid Connection Limited
450 MWBuilt High Marnham 275kV Substation
National Grid (England & Wales)
Oct 2033
Ninfield Greener Grid Park
Battery storage · Ninfield Grid Solutions Limited
450 MWScoping Ninfield 400kV Substation
National Grid (England & Wales)
Oct 2037
Yaxley GEC (Ethos Green)
Solar + storage · Yaxley Green Energy Centre Ltd
450 MWAwaiting Consents Yaxley 400kV Substation
National Grid (England & Wales)
Oct 2031
Cdcl
Gas · Uniper UK Limited
445 MWBuilt Cottam 400kV Substation
National Grid (England & Wales)
Enfield
Gas · Uniper UK Limited
442 MWBuilt Brimsdown 132kV Substation
National Grid (England & Wales)
Hornsea Power Station 2A
Offshore wind · Breesea Limited
440 MWBuilt Hornsea Platform 2A Offshore Substation
National Grid (England & Wales)
Hornsea Power Station 2B
Offshore wind · Soundmark Wind Limited
440 MWBuilt Hornsea Platform 2B Offshore Substation
National Grid (England & Wales)
Hornsea Power Station 2C
Offshore wind · Sonningmay Wind Limited
440 MWBuilt Hornsea Power Station 2C Offshore platform Substation
National Grid (England & Wales)
Kell440Mw BESS
Battery storage · Care Power (Kellingley) Limited
440 MWScoping Kellingley IDNO GSP
National Grid (England & Wales)
Oct 2035
Overton440Mw BESS
Battery storage · Care Power (Overton) Limited
440 MWScoping North Humber Connection Node E 400kV Substation
National Grid (England & Wales)
Oct 2035
Pollington Hybrid
Solar + storage · Edf Energy Renewables Limited
440 MWScoping Leeds North Connection Node B 400kV Substation
National Grid (England & Wales)
Oct 2035
Indian Queens
Solar + storage · Gridmove Ltd
437 MWScoping Indian Queens 400kV Substation
National Grid (England & Wales)
Oct 2031
Staythorpe (BESS and PV)
Solar + storage · Sse Staythorpe Power Limited
437 MWConsents Approved Staythorpe 400kV Substation
National Grid (England & Wales)
Sep 2028
Kenwick Solar
Solar · Anesco Limited
431 MWScoping Shrewsbury 400kV Substation
National Grid (England & Wales)
Oct 2037
Page 9 of 27

Sources: NESO Transmission Entry Capacity (TEC) register and interconnector register (downloaded 8 November 2026); NESO Clean Power 2030 network map (existing and planned circuits, substations and network projects); National Grid Electricity Transmission overhead line routes. Contains data from NESO, licensed under the NESO Open Data Licence, and National Grid open data. Projects are placed at their connection substation, not the generating site; projects at new, unnamed “connection nodes” are listed but not mapped.