Grid connection projects in the connection queue on the National Grid (England & Wales) network

Every generator, battery and interconnector with an agreement to connect to the GB transmission network, from early scoping to built. Filter by technology, stage or network, and open a project for its connection details.

Projects shown968461.1 GW in total
In planning968scoping or awaiting consent
Consented or building149closest to connecting
Built212connected and operating

Map

Loading projects…

Voltage400 kV275 kV132 kVHVDCNew HVAC

ProjectsPlanningConsentedConstructionBuiltMajor project with its own page

Projects

968 projects · page 6 of 20
ProjectCapacityStageConnection siteFrom
Sandford
Solar + storage · Sse De Solar Holdco Limited
600 MWScoping SANDFORD B 400kV SUBSTATION
National Grid (England & Wales)
Oct 2037
Southery
Solar + storage · Sse Southery Solar Limited
600 MWScoping Southery 400kV Substation
National Grid (England & Wales)
Oct 2031
St Asaph SSE
Solar + storage · Sse De Solar Holdco Limited
600 MWScoping Bodelwyddan 400kV Substation
National Grid (England & Wales)
Nov 2037
Steeple Solar Farm
Solar + storage · Steeple Solar Farm Limited
600 MWScoping West Burton 400kV Substation
National Grid (England & Wales)
Oct 2029
West Haddon
Solar + storage · Sse De Solar Holdco Limited
600 MWScoping West Haddon 400kV Substation
National Grid (England & Wales)
Oct 2039
Willington
Solar + storage · Sse Utility Solutions Limited
600 MWScoping Willington 400kV Substation
National Grid (England & Wales)
Oct 2029
Ratcliffe-on-Soar II
Solar + storage · Enso Green Holdings Limited
590 MWScoping Ratcliffe-On-Soar 400kV Substation
National Grid (England & Wales)
Oct 2033
Tween Bridge Solar Park
Solar + storage · RWE Renewables UK Solar and Storage Limited
590 MWScoping Trent Valley North Connection Node B 400kV Substation
National Grid (England & Wales)
Nov 2032
Navenby GEC (Ethos Green)
Solar + storage · Navenby Green Energy Centre Ltd
580 MWAwaiting Consents Navenby 400kV Substation
National Grid (England & Wales)
Oct 2033
Market Harborough GEC (Ethos Green)
Solar + storage · Market Harborough Green Energy Centre Ltd
560 MWAwaiting Consents Market Harborough 400kV Substation
National Grid (England & Wales)
Oct 2032
Eggborough
Battery storage · Sse Eggborough Limited
550 MWScoping Eggborough 400kV Substation
National Grid (England & Wales)
Jun 2032
Elmya Towcester BESS
Battery storage · Rpc Elmya Carnation Towcester Limited
550 MWScoping Derbyshire Connection Node I 400kV Substation
National Grid (England & Wales)
Oct 2037
Graeme Road Solar & BESS
Solar + storage · Greentech Projects Holding UK Limited
550 MWScoping Ryhall 400kV Substation
National Grid (England & Wales)
Oct 2038
New Marton GEC
Solar + storage · New Marton Green Energy Centre Limited
550 MWScoping Cheshire Connection Node A2 400kV
National Grid (England & Wales)
Oct 2037
Astwood Solar Farm GEC
Solar + storage · Astwood Green Energy Ltd
520 MWScoping West Anglia Connection Node G 400kV Substation
National Grid (England & Wales)
Oct 2034
Cottered - PVDP
Solar + storage · SolarNine Ltd
520 MWScoping West Anglia Connection Node D 400kV Substation
National Grid (England & Wales)
Oct 2034
Yaxley
Solar + storage · Connectid 2 Limited
520 MWAwaiting Consents North Anglia Connection Node E 400kV Substation
National Grid (England & Wales)
Oct 2034
Noventum -New Marton
Solar + storage · Noventum Power Solar 11 Limited
510 MWScoping Cheshire Connection Node A 400kV Substation
National Grid (England & Wales)
Oct 2037
Alcemi Bramford Battery Energy Storage Facility
Battery storage · Alcemi Storage Developments 1 Limited
500 MWScoping Bramford 400kV Substation
National Grid (England & Wales)
Oct 2030
Baglan BESS IPC
Battery storage · Ipc Grid Connection Two Limited
500 MWScoping South Wales West Connection Node B 400kV Substation
National Grid (England & Wales)
Oct 2036
Bellbroughton Energy Park
Solar + storage · Elgin Energy Es Co Limited
500 MWScoping Warwickshire Connection Node A 400kV Substation
National Grid (England & Wales)
Oct 2037
Blue Planet Solar
Solar + storage · Blue Planet Solar Limited
500 MWScoping Dungeness 400kV Substation
National Grid (England & Wales)
Aug 2031
Boreham
Solar + storage · Longfield Solar Energy Farm Limited
500 MWScoping Bulls Lodge 400kV Substation
National Grid (England & Wales)
Oct 2034
Braybrooke Solar and Battery Connection
Solar + storage · Irena BESS LIMITED
500 MWScoping Braybrooke (Network Rail) GSP
National Grid (England & Wales)
Oct 2031
Cambridgeshire Energy Storage Centre
Hydro and pumped storage · Hydrostor UK Ltd
500 MWScoping South Anglia Connection Node D 400kV Substation
National Grid (England & Wales)
Oct 2037
Carbon Free 2030
Solar + storage · Carbon Free 2030 Energy Limited
500 MWScoping Grimsby West 400kV Substation
National Grid (England & Wales)
Jun 2034
Clean Planet Solar
Solar + storage · Clean Planet Solar Farm Limited
500 MWScoping Frodsham 400kV Substation
National Grid (England & Wales)
Nov 2037
Cornwall Energy Park
Solar + storage · Green Energy Mab Ltd
500 MWScoping Tideford 400kV Substation
National Grid (England & Wales)
Dec 2036
Cottam PV & BESS
Solar + storage · O&G Solar (SPV 44) Limited
500 MWScoping Cottam 400kV Substation
National Grid (England & Wales)
Oct 2033
Creyke Beck
Solar + storage · Clean Air Renewables Limited
500 MWScoping Creyke Beck 400kV Substation
National Grid (England & Wales)
May 2033
Daines NP BESS
Battery storage · Daines Flexpower Limited
500 MWScoping Manchester South connection node A 400kv
National Grid (England & Wales)
Oct 2037
Dove Solar
Solar + storage · RWE Renewables UK Solar and Storage Limited
500 MWScoping North Anglia Connection Node E 400kV Substation
National Grid (England & Wales)
Oct 2034
Dungeness Energy Park
Solar + storage · South Kent Energy Park Limited
500 MWScoping Dungeness 400kV Substation
National Grid (England & Wales)
Oct 2037
Dungeness Energy Park (Dungeness 400kV)
Solar + storage · South Kent Energy Park Limited
500 MWScoping East Kent connection node A 400kV Substation
National Grid (England & Wales)
Oct 2033
Earl Shilton BESS
Battery storage · Exagen Normanton Energy Reserve Limited
500 MWScoping Earl Shilton 275kV
National Grid (England & Wales)
Oct 2029
East Claydon Storage
Battery storage · East Claydon Storage Limited
500 MWScoping East Claydon 400kV Substation
National Grid (England & Wales)
Oct 2026
Eaton Socon Solar
Solar + storage · Brockwell Storage & Solar Limited
500 MWScoping Eaton Socon 400kV Substation
National Grid (England & Wales)
Oct 2028
Elstree BESS NP
Battery storage · Elstree Flexpower Ltd
500 MWScoping Elstree B 275Kv Substation
National Grid (England & Wales)
Oct 2037
Enderby Solar & BESS
Solar + storage · Greentech Projects Holding UK Limited
500 MWScoping Derbyshire Connection Node H 400kV Substation
National Grid (England & Wales)
Oct 2037
Ewerby
Solar + storage · Leoda Solar Farm Limited
500 MWScoping Navenby 400kV Substation
National Grid (England & Wales)
Oct 2035
Feckenham
Solar + storage · Igp Solar 14 Limited
500 MWScoping Feckenham 400kV Substation
National Grid (England & Wales)
Jul 2029
Feckenham Energy Park
Battery storage · Green Energy Mab Ltd
500 MWScoping Feckenham 400kV Substation
National Grid (England & Wales)
Oct 2033
Green Hydrogen Solar Farm
Solar + storage · Green Hydrogen Solar Farm Limited
500 MWScoping Sealand 400kV Substation
National Grid (England & Wales)
Nov 2037
Greengage Farm
Solar + storage · Renewable Energy Systems Limited
500 MWScoping Biggleswade 400kV Substation
National Grid (England & Wales)
Oct 2034
Grendon Solar & BESS
Solar + storage · Green Hill Solar Farm Limited
500 MWScoping Grendon 400kV Substation
National Grid (England & Wales)
Jul 2029
Greta IV (b)
Solar + storage · Greta IV Limited
500 MWScoping North Anglia Connection Node B 400kV Substation
National Grid (England & Wales)
Oct 2034
Greta IV (c)
Battery storage · Greta IV Limited
500 MWScoping North Anglia Connection Node B 400kV Substation
National Grid (England & Wales)
Oct 2034
Greta IV (d)
Battery storage · Greta IV Limited
500 MWScoping North Anglia Connection Node B 400kV Substation
National Grid (England & Wales)
Oct 2034
Grimsby BESS
Battery storage · Shama BESS Limited
500 MWScoping Grimsby West 400kV Substation
National Grid (England & Wales)
Apr 2035
High Marnham BESS
Battery storage · Jg Pears Grid Connection Limited
500 MWScoping High Marnham 400kV Substation
National Grid (England & Wales)
Oct 2034
Page 6 of 20

Sources: NESO Transmission Entry Capacity (TEC) register and interconnector register (downloaded 8 November 2026); NESO Clean Power 2030 network map (existing and planned circuits, substations and network projects); National Grid Electricity Transmission overhead line routes. Contains data from NESO, licensed under the NESO Open Data Licence, and National Grid open data. Projects are placed at their connection substation, not the generating site; projects at new, unnamed “connection nodes” are listed but not mapped.