NESO TEC REGISTER · GREAT BRITAINGrid connection projects in the connection queue on the National Grid (England & Wales) network
Every generator, battery and interconnector with an agreement to connect to the GB transmission network, from early scoping to built. Filter by technology, stage or network, and open a project for its connection details.
Map
Voltage400 kV275 kV132 kVHVDCNew HVAC
ProjectsPlanningConsentedConstructionBuiltMajor project with its own page
Projects
| Project | Capacity | Stage |
|---|---|---|
| Sandford Solar + storage · Sse De Solar Holdco Limited |
600 MW | Scoping |
| Southery Solar + storage · Sse Southery Solar Limited |
600 MW | Scoping |
| St Asaph SSE Solar + storage · Sse De Solar Holdco Limited |
600 MW | Scoping |
| Steeple Solar Farm Solar + storage · Steeple Solar Farm Limited |
600 MW | Scoping |
| West Haddon Solar + storage · Sse De Solar Holdco Limited |
600 MW | Scoping |
| Willington Solar + storage · Sse Utility Solutions Limited |
600 MW | Scoping |
| Ratcliffe-on-Soar II Solar + storage · Enso Green Holdings Limited |
590 MW | Scoping |
| Tween Bridge Solar Park Solar + storage · RWE Renewables UK Solar and Storage Limited |
590 MW | Scoping |
| Navenby GEC (Ethos Green) Solar + storage · Navenby Green Energy Centre Ltd |
580 MW | Awaiting Consents |
| Market Harborough GEC (Ethos Green) Solar + storage · Market Harborough Green Energy Centre Ltd |
560 MW | Awaiting Consents |
| Eggborough Battery storage · Sse Eggborough Limited |
550 MW | Scoping |
| Elmya Towcester BESS Battery storage · Rpc Elmya Carnation Towcester Limited |
550 MW | Scoping |
| Graeme Road Solar & BESS Solar + storage · Greentech Projects Holding UK Limited |
550 MW | Scoping |
| New Marton GEC Solar + storage · New Marton Green Energy Centre Limited |
550 MW | Scoping |
| Astwood Solar Farm GEC Solar + storage · Astwood Green Energy Ltd |
520 MW | Scoping |
| Cottered - PVDP Solar + storage · SolarNine Ltd |
520 MW | Scoping |
| Yaxley Solar + storage · Connectid 2 Limited |
520 MW | Awaiting Consents |
| Noventum -New Marton Solar + storage · Noventum Power Solar 11 Limited |
510 MW | Scoping |
| Alcemi Bramford Battery Energy Storage Facility Battery storage · Alcemi Storage Developments 1 Limited |
500 MW | Scoping |
| Baglan BESS IPC Battery storage · Ipc Grid Connection Two Limited |
500 MW | Scoping |
| Bellbroughton Energy Park Solar + storage · Elgin Energy Es Co Limited |
500 MW | Scoping |
| Blue Planet Solar Solar + storage · Blue Planet Solar Limited |
500 MW | Scoping |
| Boreham Solar + storage · Longfield Solar Energy Farm Limited |
500 MW | Scoping |
| Braybrooke Solar and Battery Connection Solar + storage · Irena BESS LIMITED |
500 MW | Scoping |
| Cambridgeshire Energy Storage Centre Hydro and pumped storage · Hydrostor UK Ltd |
500 MW | Scoping |
| Carbon Free 2030 Solar + storage · Carbon Free 2030 Energy Limited |
500 MW | Scoping |
| Clean Planet Solar Solar + storage · Clean Planet Solar Farm Limited |
500 MW | Scoping |
| Cornwall Energy Park Solar + storage · Green Energy Mab Ltd |
500 MW | Scoping |
| Cottam PV & BESS Solar + storage · O&G Solar (SPV 44) Limited |
500 MW | Scoping |
| Creyke Beck Solar + storage · Clean Air Renewables Limited |
500 MW | Scoping |
| Daines NP BESS Battery storage · Daines Flexpower Limited |
500 MW | Scoping |
| Dove Solar Solar + storage · RWE Renewables UK Solar and Storage Limited |
500 MW | Scoping |
| Dungeness Energy Park Solar + storage · South Kent Energy Park Limited |
500 MW | Scoping |
| Dungeness Energy Park (Dungeness 400kV) Solar + storage · South Kent Energy Park Limited |
500 MW | Scoping |
| Earl Shilton BESS Battery storage · Exagen Normanton Energy Reserve Limited |
500 MW | Scoping |
| East Claydon Storage Battery storage · East Claydon Storage Limited |
500 MW | Scoping |
| Eaton Socon Solar Solar + storage · Brockwell Storage & Solar Limited |
500 MW | Scoping |
| Elstree BESS NP Battery storage · Elstree Flexpower Ltd |
500 MW | Scoping |
| Enderby Solar & BESS Solar + storage · Greentech Projects Holding UK Limited |
500 MW | Scoping |
| Ewerby Solar + storage · Leoda Solar Farm Limited |
500 MW | Scoping |
| Feckenham Solar + storage · Igp Solar 14 Limited |
500 MW | Scoping |
| Feckenham Energy Park Battery storage · Green Energy Mab Ltd |
500 MW | Scoping |
| Green Hydrogen Solar Farm Solar + storage · Green Hydrogen Solar Farm Limited |
500 MW | Scoping |
| Greengage Farm Solar + storage · Renewable Energy Systems Limited |
500 MW | Scoping |
| Grendon Solar & BESS Solar + storage · Green Hill Solar Farm Limited |
500 MW | Scoping |
| Greta IV (b) Solar + storage · Greta IV Limited |
500 MW | Scoping |
| Greta IV (c) Battery storage · Greta IV Limited |
500 MW | Scoping |
| Greta IV (d) Battery storage · Greta IV Limited |
500 MW | Scoping |
| Grimsby BESS Battery storage · Shama BESS Limited |
500 MW | Scoping |
| High Marnham BESS Battery storage · Jg Pears Grid Connection Limited |
500 MW | Scoping |
Sources: NESO Transmission Entry Capacity (TEC) register and interconnector register (downloaded 8 November 2026); NESO Clean Power 2030 network map (existing and planned circuits, substations and network projects); National Grid Electricity Transmission overhead line routes. Contains data from NESO, licensed under the NESO Open Data Licence, and National Grid open data. Projects are placed at their connection substation, not the generating site; projects at new, unnamed “connection nodes” are listed but not mapped.