| Project | Capacity | Stage |
|---|---|---|
| Landulph Solar + storage · Pivoted Power LLP |
50 MW | Consents Approved |
| Cuxton 49.5MW BESS Battery storage · Cuxton Energy Storage Limited |
50 MW | Consents Approved |
| Norwich Yare Solar + storage · Ashgreen Energyfarm Limited |
50 MW | Consents Approved |
| Dog Trap Lane Battery storage · HB411MIN Limited |
48 MW | Consents Approved |
| Fairholme BESS Battery storage · HB411MIN Limited |
48 MW | Consents Approved |
| Fleet (Tertiary) Solar · Cse23 Limited |
48 MW | Consents Approved |
| Fleet EGH (Tertiary) Solar + storage · Fleet Green Limited |
48 MW | Consents Approved |
| Indian Queens Battery storage · Pivoted Power LLP |
48 MW | Consents Approved |
| Indian Queens Energy Centre Solar + storage · Iq Energy Centre Limited |
48 MW | Consents Approved |
| Mannington Solar + storage · Pivoted Power LLP |
48 MW | Consents Approved |
| Mannington Tertiary Battery storage · Mannington Energy Centre Limited |
48 MW | Consents Approved |
| Minety Battery storage · HB411MIN Limited |
48 MW | Consents Approved |
| Pond Hill Farm 1 Battery storage · PD688IRO LTD |
48 MW | Consents Approved |
| Pond Hill Farm 2 BESS Battery storage · PD688IRO LTD |
48 MW | Consents Approved |
| Somerford Solar + storage · PD688IRO LTD |
48 MW | Consents Approved |
| Southfields Farm Battery storage · PD688IRO LTD |
48 MW | Consents Approved |
| St Dennis Hendra Battery storage · Sambar Power Limited |
48 MW | Consents Approved |
| Norton PV and BESS Solar + storage · Darlington Solar 1 Limited |
41 MW | Consents Approved |
| Creyke Beck Battery 2 Battery storage · Cbb Spv Limited |
29 MW | Consents Approved |
| Cilfynydd Grid Stability Services Other · Cilfynydd Grid Services Limited |
0 MW | Consents Approved |
| Eye Grid Services Facility Other · Conrad (Eye) Limited |
0 MW | Consents Approved |
| Necton Greener Grid Park Battery storage · Necton Grid Solutions Limited |
0 MW | Consents Approved |
| Sellindge Grid Stability Services Other · Sellindge Grid Services Limited |
0 MW | Consents Approved |
| Swansea Greener Grid Park - Connection 2 Other · Swansea Grid Solutions Limited |
0 MW | Consents Approved |
| Walpole Grid Services Facility Other · Conrad (Walpole) Limited |
0 MW | Consents Approved |
Sources: NESO Transmission Entry Capacity (TEC) register and interconnector register (downloaded 8 November 2026); NESO Clean Power 2030 network map (existing and planned circuits, substations and network projects); National Grid Electricity Transmission overhead line routes. Contains data from NESO, licensed under the NESO Open Data Licence, and National Grid open data. Projects are placed at their connection substation, not the generating site; projects at new, unnamed “connection nodes” are listed but not mapped.