Grid infrastructure β€Ί Connection queue β€Ί Solar + storage

SOLAR + STORAGE Β· NGET

Norwich Yare

Norwich Yare is a 50 MW solar + storage project consented, connecting to the National Grid (England & Wales) network at Norwich GSP, with capacity due from December 2025. The connection agreement is held by Ashgreen Energyfarm Limited.

Project stageConsented
  1. Planning (completed)
  2. Consented (current stage)
  3. Construction (not yet reached)
  4. OperatingFrom Dec 2025 (not yet reached)
  5. Closed (not yet reached)

Connection details

NESO project number
PRO-001076
Customer
Ashgreen Energyfarm Limited
Technology
Energy Storage System, PV Array (Photo Voltaic/solar)
Total capacity
50 MW
Change in this agreement
+50 MW
Capacity effective from
18 December 2025
Connection site
Norwich GSP
Transmission owner
National Grid (England & Wales)
Connection type
Direct connection to the transmission network
NESO project status
Consents Approved

Connection site

The marker shows the connection substation, not the project itself, with the transmission network around it.

Projects connecting near Norwich GSP Β· Grid map

Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem