🔌 EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more → Skip to main content

Home › Grid infrastructure › Connection queue

NESO TEC REGISTER · GREAT BRITAIN

Grid connection projects in the connection queue on the National Grid (England & Wales) network

Every generator, battery and interconnector with an agreement to connect to the GB transmission network, from early scoping to built. Filter by technology, stage or network, and open a project for its connection details.

Projects shown1,329586.0 GW in total
In planning968scoping or awaiting consent
Consented or building149closest to connecting
Built212connected and operating

Map

Loading projects…

Voltage400 kV275 kV132 kVHVDCNew HVAC

ProjectsPlanningConsentedConstructionBuiltMajor project with its own page

Projects

1,329 projects · page 14 of 27
ProjectCapacityStageConnection siteFrom
Harker PV & BESS Sub
Solar + storage · Harker Energy Park Limited
250 MWScoping Harker 400kV Substation
National Grid (England & Wales)
Nov 2037
Jackdaw BESS
Battery storage · Downing Renewable Developments LLP
250 MWScoping Leeds North Connection Node B 400kV Substation
National Grid (England & Wales)
Oct 2035
Killingholme PV & BESS
Solar + storage · O&G Solar (SPV 47) Limited
250 MWScoping Raventhorpe 400kV Substation
National Grid (England & Wales)
Oct 2035
Lime Tree Energy Park
Solar + storage · Bnrg Langmead Limited
250 MWScoping South Anglia Connection Node E 400kV Substation
National Grid (England & Wales)
Oct 2034
Monk Fryston
Battery storage · Downing Renewable Developments LLP
250 MWScoping Monk Fryston 275kV Substation
National Grid (England & Wales)
Oct 2035
Norwich Main BESS
Solar + storage · Tasway Energy Park Limited
250 MWScoping North Anglia Connection Node A 400kV
National Grid (England & Wales)
Oct 2032
Osbaldwick PV & BESS Sub
Solar + storage · York Energy Park Limited
250 MWScoping Osbaldwick 400kV Substation
National Grid (England & Wales)
Aug 2033
Patford Bridge PV & BESS
Solar + storage · Northampton Energy Park Limited
250 MWScoping Patford Bridge 400kV Substation
National Grid (England & Wales)
Oct 2033
Pelham BESS
Battery storage · Pelham Energy Park Limited
250 MWScoping Pelham 2 400Kv Substation
National Grid (England & Wales)
Oct 2032
Penketh Hall Farm
Battery storage · Net Zero One Ltd
250 MWScoping Fiddlers Ferry 275kV Substation
National Grid (England & Wales)
Sep 2027
Poppleton PV & BESS Sub
Solar + storage · York Energy Park Limited
250 MWScoping Thormanby 400kV Substation
National Grid (England & Wales)
Oct 2035
Spennymoor PV & BESS Sub
Solar + storage · O&G Solar (SPV 20) Limited
250 MWScoping Spennymoor 400kV Substation
National Grid (England & Wales)
Oct 2035
Thornton PV & BESS Sub
Solar + storage · O&G Solar (SPV 57) Limited
250 MWScoping Thornton B 400kV Substation
National Grid (England & Wales)
Oct 2035
Waltham Cross PV & BESS Sub
Solar + storage · Epping Energy Park Limited
250 MWScoping Waltham Cross B 400kV Substation
National Grid (England & Wales)
Oct 2032
Warley PV & BESS
Battery storage · O&G Solar (SPV 36) Limited
250 MWScoping Warley 275kV Substation
National Grid (England & Wales)
Oct 2031
Willington PV & BESS
Solar + storage · Willington Energy Park Limited
250 MWScoping Willington East 400kV Substation
National Grid (England & Wales)
Oct 2033
Lapwing Fen II
Battery storage · Eclipse Power Networks Limited
250 MWScoping Lapwing Fen II (Walpole) IDNO Substation
National Grid (England & Wales)
Oct 2029
Aberthaw Energy
Battery storage · Aberthaw Energy Limited
249 MWScoping Aberthaw 275kV Substation
National Grid (England & Wales)
Oct 2028
Afon Ddaw
Solar + storage · Lightsource Spv 214 Limited
249 MWScoping Aberthaw 275kV Substation
National Grid (England & Wales)
Oct 2029
Beanacre 2 BESS
Battery storage · Grenergy Renewables UK Limited
249 MWScoping Severn Connection Node B 400kV Substation
National Grid (England & Wales)
Oct 2037
Bewley BESS
Battery storage · Apatura Project 35 Ltd
249 MWScoping Wearside Connection Node C 400kV Substation
National Grid (England & Wales)
Oct 2035
Bradford West BESS Substation
Battery storage · O&G Solar (SPV 36) Limited
249 MWScoping Bradford West 275kV Substation
National Grid (England & Wales)
Oct 2036
Caldwell Road
Battery storage · Tagenergy Development UK Limited
249 MWScoping Drakelow 400kV Substation
National Grid (England & Wales)
Oct 2028
Codham Hall BESS
Battery storage · Pulse Clean Energy Limited
249 MWScoping Warley 275kV Substation
National Grid (England & Wales)
Oct 2037
EcoGrainWest
Solar + storage · Econergy International Limited
249 MWAwaiting Consents Grain West 400kV Substation
National Grid (England & Wales)
Dec 2029
EcoGrimsbyWest
Solar + storage · Econergy International Limited
249 MWScoping Grimsby West 400kV Substation
National Grid (England & Wales)
Oct 2033
EcoLovedean
Battery storage · Econergy International Limited
249 MWScoping Lovedean 400kV Substation
National Grid (England & Wales)
Mar 2031
EcoMablethorpe
Solar + storage · Econergy International Limited
249 MWScoping Mablethorpe 400kV Substation
National Grid (England & Wales)
Aug 2034
EcoStocksbridge
Solar + storage · Econergy International Limited
249 MWScoping Stocksbridge 400kV Substation
National Grid (England & Wales)
Oct 2036
EcoUskmouth
Battery storage · Aw2 Energy Storage Limited
249 MWScoping Uskmouth 275kV Substation
National Grid (England & Wales)
Jun 2029
EcoWymondley
Solar + storage · Econergy International Limited
249 MWScoping Wymondley 2 400kV Substation
National Grid (England & Wales)
Oct 2033
EcoYaxley1
Solar + storage · Econergy International Limited
249 MWScoping Yaxley 400kV Substation
National Grid (England & Wales)
Dec 2030
Elland BESS
Battery storage · Pulse Clean Energy Limited
249 MWScoping Leeds North Connection Node E 275kV Substation
National Grid (England & Wales)
Oct 2037
ER BRF 2 Energy
Solar + storage · Er Project Development Co Limited
249 MWScoping Bramford 400kV Substation
National Grid (England & Wales)
Jul 2033
Eskrigg End BESS
Battery storage · Energi Generation 6 Ltd
249 MWScoping Hutton 400kV Substation
National Grid (England & Wales)
Nov 2037
Exeter BESS and PV (Post-Interactivity Revised Offer)
Solar + storage · Broadclyst Energy Storage Limited
249 MWScoping Exeter Main 400kV Substation
National Grid (England & Wales)
Dec 2029
Hirfynydd and Mynydd Drumaur
Solar + storage · Edf Energy Renewables Limited
249 MWScoping Swansea North 400kV Substation
National Grid (England & Wales)
Dec 2036
Isenau Eight
Battery storage · Isenau Energy Storage Resources Eight Limited
249 MWScoping Hawthorn Pit 400kV Substation
National Grid (England & Wales)
Oct 2033
Langage Battery Storage
Battery storage · Langage Energy Park Limited
249 MWScoping Langage 400kV Substation
National Grid (England & Wales)
Oct 2031
Mickleham Energy Storage
Battery storage · Bw Ess Development UK Limited
249 MWScoping Rowdown 400kV Substation
National Grid (England & Wales)
Oct 2031
Mosedale Energy
Battery storage · Mosedale Energy Limited
249 MWScoping High Marnham 400kV Substation
National Grid (England & Wales)
Oct 2033
Mwyndy Storage
Battery storage · Cenin Renewables Limited
249 MWScoping Aberthaw 275kV Substation
National Grid (England & Wales)
Oct 2037
Noventum - Biggleswade
Solar + storage · Noventum Power Solar 7 Limited
249 MWScoping Biggleswade 400kV Substation
National Grid (England & Wales)
Oct 2037
Noventum Market Harborough
Solar + storage · Noventum Power Solar 1 Limited
249 MWScoping West Anglia Connection Node F 400kV Substation
National Grid (England & Wales)
Oct 2034
Noventum Navenby
Solar + storage · Noventum Power Solar 4 Limited
249 MWScoping Trent Valley South Connection Node C 400kV Substation
National Grid (England & Wales)
Oct 2035
Ouse Energy Storage
Battery storage · Ouse Energy Limited
249 MWScoping Kemsley 400kV Substation
National Grid (England & Wales)
Oct 2027
Penn Battery Storage
Battery storage · Anglo Energy Storage Ltd
249 MWScoping Penn 275kV Substation
National Grid (England & Wales)
Jun 2033
Perry Barr BESS
Battery storage · Perry Barr Limited
249 MWScoping Warwickshire Connection Node F 400kV Substation
National Grid (England & Wales)
Oct 2037
Red House Farm - Friston 400kV 249MW connection
Battery storage · Cambridge Power Limited
249 MWScoping South Anglia Connection Node E 400kV Substation
National Grid (England & Wales)
Oct 2034
Sheaf Energy
Battery storage · Sheaf Energy Limited
249 MWConsents Approved Richborough 400kV Substation
National Grid (England & Wales)
Apr 2025
Page 14 of 27

Sources: NESO Transmission Entry Capacity (TEC) register and interconnector register (downloaded 8 November 2026); NESO Clean Power 2030 network map (existing and planned circuits, substations and network projects); National Grid Electricity Transmission overhead line routes. Contains data from NESO, licensed under the NESO Open Data Licence, and National Grid open data. Projects are placed at their connection substation, not the generating site; projects at new, unnamed “connection nodes” are listed but not mapped.