🔌 EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more → Skip to main content

Grid infrastructure › Connection queue › Solar + storage

SOLAR + STORAGE · NGET

EcoStocksbridge

EcoStocksbridge is a 249 MW solar + storage project in planning, connecting to the National Grid (England & Wales) network at Stocksbridge 400kV Substation, with capacity due from October 2036. The connection agreement is held by Econergy International Limited.

Project stageIn planning
  1. Planning (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingFrom Oct 2036 (not yet reached)
  5. Closed (not yet reached)

Scoping and awaiting consents are both shown as planning. A connection agreement does not mean the project will be built: many queue projects never reach construction.

Connection details

NESO project number
PRO-003789
Customer
Econergy International Limited
Technology
Demand, Energy Storage System, PV Array (Photo Voltaic/solar)
Total capacity
249 MW
Change in this agreement
+249 MW
Capacity effective from
30 October 2036
Connection site
Stocksbridge 400kV Substation
Transmission owner
National Grid (England & Wales)
Connection type
Direct connection to the transmission network
NESO project status
Scoping

Connection site

The marker shows the connection substation, not the project itself, with the transmission network around it.

Projects connecting near Stocksbridge · Grid map

Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem