Grid infrastructure › Connection queue › Solar + storage

SOLAR + STORAGE · NGET

Harker PV & BESS Sub

Harker PV & BESS Sub is a 250 MW solar + storage project in planning, connecting to the National Grid (England & Wales) network at Harker 400kV Substation, with capacity due from November 2037. The connection agreement is held by Harker Energy Park Limited.

Project stageIn planning
  1. Planning (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingFrom Nov 2037 (not yet reached)
  5. Closed (not yet reached)

Scoping and awaiting consents are both shown as planning. A connection agreement does not mean the project will be built: many queue projects never reach construction.

Connection details

NESO project number
PRO-002615
Customer
Harker Energy Park Limited
Technology
Energy Storage System, PV Array (Photo Voltaic/solar)
Total capacity
250 MW
Change in this agreement
+250 MW
Capacity effective from
1 November 2037
Connection site
Harker 400kV Substation
Transmission owner
National Grid (England & Wales)
Connection type
Direct connection to the transmission network
NESO project status
Scoping
Connections reform gate
Gate 1

Connection site

The marker shows the connection substation, not the project itself, with the transmission network around it.

Projects connecting near Harker · Grid map

Other projects at Harker 400kV Substation

Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem