Grid infrastructure › Connection queue › Solar + storage

SOLAR + STORAGE · NGET

Osbaldwick PV & BESS Sub

Osbaldwick PV & BESS Sub is a 250 MW solar + storage project in planning, connecting to the National Grid (England & Wales) network at Osbaldwick 400kV Substation, with capacity due from August 2033. The connection agreement is held by York Energy Park Limited.

Project stageIn planning
  1. Planning (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingFrom Aug 2033 (not yet reached)
  5. Closed (not yet reached)

Scoping and awaiting consents are both shown as planning. A connection agreement does not mean the project will be built: many queue projects never reach construction.

Connection details

NESO project number
PRO-002582
Customer
York Energy Park Limited
Technology
Energy Storage System, PV Array (Photo Voltaic/solar)
Total capacity
250 MW
Change in this agreement
+250 MW
Capacity effective from
30 August 2033
Connection site
Osbaldwick 400kV Substation
Transmission owner
National Grid (England & Wales)
Connection type
Direct connection to the transmission network
NESO project status
Scoping
Connections reform gate
Gate 1

Connection site

The marker shows the connection substation, not the project itself, with the transmission network around it.

Projects connecting near Osbaldwick · Grid map

Other projects at Osbaldwick 400kV Substation

Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem