Home › Grid infrastructure › Connection queue

NESO TEC REGISTER · GREAT BRITAIN

Grid connection projects in the connection queue on the National Grid (England & Wales) network

Every generator, battery and interconnector with an agreement to connect to the GB transmission network, from early scoping to built. Filter by technology, stage or network, and open a project for its connection details.

Projects shown1,329586.0 GW in total
In planning968scoping or awaiting consent
Consented or building149closest to connecting
Built212connected and operating

Map

Loading projects…

Voltage400 kV275 kV132 kVHVDCNew HVAC

ProjectsPlanningConsentedConstructionBuiltMajor project with its own page

Projects

1,329 projects · page 10 of 27
ProjectCapacityStageConnection siteFrom
Great Yarmouth
Gas · RWE Generation UK Plc
420 MWBuilt Norwich Main 132kV
National Grid (England & Wales)
Noventum - Stocksbridge
Battery storage · Noventum Power Solar 14 Limited
410 MWScoping Leeds South Connection Node C 400kV Substation
National Grid (England & Wales)
Oct 2035
Corby
Gas · Corby Power Limited
401 MWBuilt Corby 132kV Substation
National Grid (England & Wales)
Bicker Drove
Battery storage · Rewe 1 Limited
400 MWScoping Navenby 400kV Substation
National Grid (England & Wales)
May 2034
Bicker Fen
Solar + storage · Ib Vogt UK Ltd
400 MWScoping Trent Valley South Connection Node C 400kV Substation
National Grid (England & Wales)
Oct 2034
Boom Power Feckenham Generation Hub
Solar + storage · Wheaten Hill BESS Limited
400 MWScoping Feckenham 400kV Substation
National Grid (England & Wales)
Oct 2033
Btgbbik01 - Bicker Fen 400Mw BESS
Battery storage · Field Bicker Fen Ltd
400 MWScoping Trent Valley South Connection Node A 400k
National Grid (England & Wales)
Oct 2039
Capenhurst
Solar + storage · Enso Green Holdings Q Limited
400 MWScoping Capenhurst 275kV Substation
National Grid (England & Wales)
Sep 2033
Cellarhead
Solar + storage · Enso Green Holdings X Limited
400 MWScoping Cellarhead 400kV Substation
National Grid (England & Wales)
Oct 2033
Cellarhead Green Energy Centre
Solar + storage · S & C Energy Limited
400 MWAwaiting Consents Cellarhead 400kV Substation
National Grid (England & Wales)
Oct 2028
Cellarhead PV & BESS Station
Solar + storage · Ib Vogt UK Ltd
400 MWScoping Manchester South Connection Node B 400kV Substation
National Grid (England & Wales)
Oct 2037
Celtic Offshore Wind Farm
Offshore wind · RWE Offshore Wind
400 MWScoping Rwe Celtic Offshore Substation
National Grid (England & Wales)
Oct 2031
Chickerell
Solar + storage · Enso Green Holdings X Limited
400 MWAwaiting Consents Chickerell 400kV Substation
National Grid (England & Wales)
Oct 2038
Chickerell Solar PV & BESS
Battery storage · Chickerell Storage Limited
400 MWConsents Approved Chickerell 400kV Substation
National Grid (England & Wales)
Oct 2028
Church Road Farm
Battery storage · Qair Renewables UK Limited
400 MWScoping South Anglia Connection Node D 132kV Substation
National Grid (England & Wales)
Oct 2034
Cilfynydd
Solar + storage · Enso Green Holdings X Limited
400 MWAwaiting Consents Cilfynydd 400kV Substation
National Grid (England & Wales)
Oct 2030
Cilfynydd Green Energy Centre
Solar + storage · Cilfynydd Ng Limited
400 MWAwaiting Consents Cilfynydd 400kV Substation
National Grid (England & Wales)
Oct 2029
Cottam-Ryhall Solar & BESS
Solar + storage · Crh Renewables Limited
400 MWScoping Trent Valley South Connection Node B 400kV Substation
National Grid (England & Wales)
Oct 2034
Drax Solar
Solar · East Yorkshire Solar Farm Limited
400 MWScoping Drax 400kV Substation
National Grid (England & Wales)
Sep 2029
Dogger Bank South East
Offshore wind · RWE Renewables UK Dogger Bank South (East) Limited
400 MWScoping Birkhill Wood 400kV Substation
National Grid (England & Wales)
Oct 2030
Dogger Bank South West
Offshore wind · Rwe Renewables UK Dogger Bank South (West) Limited
400 MWScoping Birkhill Wood 400kV Substation
National Grid (England & Wales)
Oct 2030
Drakelow Green Energy Centre
Solar + storage · Drakelow Ng Limited
400 MWAwaiting Consents Drakelow 400kV Substation
National Grid (England & Wales)
Apr 2028
Drakelow PV & BESS Station
Solar + storage · IBV Elford Park Solar Limited
400 MWScoping Drakelow 400kV Substation
National Grid (England & Wales)
Oct 2037
Dudgeon Offshore Wind Farm
Offshore wind · Dudgeon Offshore Wind Limited
400 MWBuilt Necton 400kV Substation
National Grid (England & Wales)
Dunclent Battery Storage
Battery storage · Firma Vogt Solar Ltd
400 MWScoping Warwickshire Connection Node A 400kV Substation
National Grid (England & Wales)
Oct 2037
ER MKH Energy
Solar + storage · Er Project Development Co Limited
400 MWScoping Market Harborough 400kV Substation
National Grid (England & Wales)
Oct 2033
Exeter Main
Solar + storage · Enso Green Holdings X Limited
400 MWScoping Exeter 400kV Substation
National Grid (England & Wales)
Oct 2033
Feckenham
Solar + storage · Enso Green Holdings X Limited
400 MWAwaiting Consents Feckenham 400kV Substation
National Grid (England & Wales)
Oct 2036
Feckenham PV & BESS Station
Solar + storage · Ib Vogt UK Ltd
400 MWScoping Feckenham 400kV Substation
National Grid (England & Wales)
Oct 2037
GF Norwich BESS
Battery storage · GF Norwich Energy Ltd
400 MWScoping NORTH ANGLIA CONNECTION NODE A 400kV SUBSTATION
National Grid (England & Wales)
Oct 2034
GF Thornton Energy BESS
Battery storage · Thornton Energy Ltd
400 MWScoping North Humber Connection Node A 400kV Substation
National Grid (England & Wales)
Oct 2035
Hams Hall Green Energy Centre
Solar + storage · Hams Hall Ng Limited
400 MWScoping Hams Hall 400kV Substation
National Grid (England & Wales)
Oct 2028
Harker Green Energy Centre
Solar + storage · Blackdyke BESS Limited
400 MWAwaiting Consents Harker 400kV Substation
National Grid (England & Wales)
Oct 2028
Heckington Fen Solar Park
Solar + storage · Ecotricity (Heck Fen Solar) Limited
400 MWScoping Bicker Fen 400kV Substation
National Grid (England & Wales)
Oct 2028
Heysham Green Energy Centre
Solar + storage · Heysham Green Ng Limited
400 MWAwaiting Consents Middleton 400KV Substation
National Grid (England & Wales)
Oct 2028
High Marnham 400
Solar + storage · Enso Green Holdings X Limited
400 MWAwaiting Consents High Marnham 400kV Substation
National Grid (England & Wales)
Oct 2033
High Marnham 400MW Field BESS
Battery storage · Field High Marnham Ltd
400 MWScoping Trent Valley South Connection Node G 400kV Substation
National Grid (England & Wales)
Oct 2039
Hope Battery Storage
Battery storage · Ibv Brinkburn Energy Park Limited
400 MWScoping Blyth 400kV Substation
National Grid (England & Wales)
Oct 2036
Hornsea Power Station 1A
Offshore wind · Hornsea 1 Limited
400 MWBuilt Hornsea Platform 1A Offshore Substation
National Grid (England & Wales)
Hornsea Power Station 1B
Offshore wind · Hornsea 1 Limited
400 MWBuilt Hornsea Platform 1B Offshore Substation
National Grid (England & Wales)
Hornsea Power Station 1C
Offshore wind · Hornsea 1 Limited
400 MWBuilt Hornsea Platform 1C Offshore Substation
National Grid (England & Wales)
Ironbridge Green Energy Centre
Solar + storage · Ironbridge Green Ng Limited
400 MWAwaiting Consents Ironbridge 400kV Substation
National Grid (England & Wales)
Oct 2029
Jersey Farm BESS
Battery storage · Cse39 Limited
400 MWConsents Approved Jersey Farm 400kV Substation
National Grid (England & Wales)
Oct 2032
Kearsley North Green Energy Centre
Solar + storage · Kearsley North Green NG Limited
400 MWScoping Kearsley 275kV Substation
National Grid (England & Wales)
Oct 2028
Kingsnorth Power Station
Solar + storage · Qe Kingsnorth Spv Limited
400 MWScoping Kingsnorth B 400Kv Substation
National Grid (England & Wales)
Oct 2032
Kirkby Green Energy Centre
Solar + storage · Kirkby Green Ng Limited
400 MWScoping Kirkby 275kV Substation
National Grid (England & Wales)
Oct 2028
Langage 400
Solar + storage · Enso Green Holdings X Limited
400 MWScoping Langage 400kV Substation
National Grid (England & Wales)
Oct 2038
Legacy 400
Solar + storage · Enso Green Holdings Limited
400 MWScoping Legacy 400kV Substation
National Grid (England & Wales)
Oct 2037
Legacy Green Energy Centre
Battery storage · Legacy Green Energy Limited
400 MWAwaiting Consents Legacy 400kV Substation
National Grid (England & Wales)
Oct 2027
Littlebrook GEC (Ethos Green)
Solar + storage · Littlebrook Green Energy Centre Ltd
400 MWAwaiting Consents Rowdown 400kV Substation
National Grid (England & Wales)
Oct 2031
Page 10 of 27

Sources: NESO Transmission Entry Capacity (TEC) register and interconnector register (downloaded 8 November 2026); NESO Clean Power 2030 network map (existing and planned circuits, substations and network projects); National Grid Electricity Transmission overhead line routes. Contains data from NESO, licensed under the NESO Open Data Licence, and National Grid open data. Projects are placed at their connection substation, not the generating site; projects at new, unnamed “connection nodes” are listed but not mapped.