United States βΊ Power plants βΊ Solar farms βΊ Texas
OCTARY USA Β· SOLAR FARMSPlanned solar farms in Texas
Every utility-scale solar farm in the United States of 1 MW or more: operating, under construction, planned, retired and cancelled. Click a state to drill down, or search near a place.
Operating251plants
Operating capacity35.0 GWnameplate
Under construction14.7 GW60 plants
Whole pipeline37.3 GWplanned, approved and building
Map
Loading plantsβ¦
OperatingUnder constructionApprovedPlannedRetiredCancelled
Plants
84 plants Β· page 1 of 2
| Plant | Capacity | Stage |
|---|---|---|
| Gigawatt Solar | 773 MW | In planning |
| Short Creek Solar | 606 MW | In planning |
| Hecate Energy Harley Hand Solar LLC | 514 MW | In planning |
| IP Meitner Solar | 500 MW | In planning |
| IP Roman Solar | 500 MW | In planning |
| La Salle Solar | 500 MW | In planning |
| Sunscape Renewable Energy | 500 MW | In planning |
| Hollow Branch Creek | 460 MW | In planning |
| Soleil | 450 MW | In planning |
| Hanson | 396 MW | In planning |
| Cuchillas PV and BESS | 306 MW | In planning |
| Briggs Solar, LLC | 305 MW | In planning |
| Amerada | 300 MW | In planning |
| Cazadores Solar | 300 MW | In planning |
| Pease River Solar | 300 MW | In planning |
| Red Hollow Renewable Energy | 300 MW | In planning |
| Sunrose Renewable Energy | 300 MW | In planning |
| Uvalde Solar 2 | 300 MW | In planning |
| OCI SunRoper | 260 MW | In planning |
| Oak Valley Solar | 251 MW | In planning |
| Clairemont Solar | 250 MW | In planning |
| Lazy U Solar 1 | 250 MW | In planning |
| Lazy U Solar 2 | 250 MW | In planning |
| Mystic Springs Renewable Energy (Hybrid) | 250 MW | In planning |
| Selenite Springs Solar | 250 MW | In planning |
| TREX US Red Holly | 250 MW | In planning |
| Lupinus Solar 2, LLC | 244 MW | In planning |
| Despain Solar | 236 MW | In planning |
| Alira | 223 MW | In planning |
| Leuven Solar LLC | 217 MW | In planning |
| SGT Hoskins Solar Project Hybrid | 204 MW | In planning |
| Erath County Solar | 204 MW | In planning |
| Erin | 202 MW | In planning |
| Echols Grove Solar | 201 MW | In planning |
| Abeja Solar Farm | 200 MW | In planning |
| Alina Energy LLC | 200 MW | In planning |
| Dahlia Energy | 200 MW | In planning |
| Eldora Energy LLC | 200 MW | In planning |
| Hornet Solar II (TX) (Hybrid) | 200 MW | In planning |
| Lumberton PV I, LLC | 200 MW | In planning |
| OCI Hillsboro | 200 MW | In planning |
| Waco Solar II | 200 MW | In planning |
| Greenalia Solar Power Blackwelder Ranch | 200 MW | In planning |
| Accalia Point Solar, LLC | 191 MW | In planning |
| Harryoung PV and BESS | 190 MW | In planning |
| Noor Solar | 188 MW | In planning |
| Dunlay Solar | 180 MW | In planning |
| Flatland Solar | 180 MW | In planning |
| Tokio Solar | 170 MW | In planning |
| Segno Solar Station | 170 MW | In planning |
Page 1 of 2
Next β
Operating capacity by state
Click a state to drill down; click it again to go back to the whole country.
Largest owners and operators
By capacity in the current view. Click to see their plants.
- Vesper Energy Development LLC5 plants Β· 1,550 MW
- Intersect USA, LLC3 plants Β· 1,305 MW
- Cypress Creek Renewables3 plants Β· 1,146 MW
- Gigawatt Solar LLC1 plants Β· 773 MW
- Wichita Solar I, LLC1 plants Β· 606 MW
- Hecate Energy Harley Hand Solar LLC1 plants Β· 514 MW
- La Salle Solar LLC1 plants Β· 500 MW
- Parliament Energy Holdings LLC1 plants Β· 460 MW
- RIC Development, LLC4 plants Β· 401 MW
- Sunraycer Assets I LLC2 plants Β· 345 MW
- Entergy Louisiana LLC2 plants Β· 311 MW
- Gransolar Texas Two LLC1 plants Β· 306 MW
Source: U.S. Energy Information Administration, Form EIA-860M, Monthly Update to the Annual Electric Generator Report, September 2026. Includes generators of 1 MW and over at plants connected to the grid. Planned dates are developers' targets reported to EIA and often move. US EV charging map