United States › Power plants › Solar farms › Texas
SOLAR FARMSLeuven Solar LLC
Leuven Solar LLC is a 217 MW planned solar farm in Nolan County, Texas, operated by Belgian Renewable Energy Group (BREG).
Plant statusIn planning
- Planning (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingTarget Dec 2029 (not yet reached)
- Closed (not yet reached)
Planned start of operation reported to EIA: Dec 2029.
Generators
Each generating unit EIA lists at this plant.
| Unit | Technology | Capacity | Status |
|---|---|---|---|
| SEPAS | Solar Photovoltaic | 217 MW | Planned, approvals not yet sought |
Plant details
- Operator
- Belgian Renewable Energy Group (BREG)
- Location
- Nolan County, Texas
- Balancing authority
- ERCO
- Sector
- IPP Non-CHP
- Capacity
- Planned: 217 MW
- EIA plant ID
- 67996
Location
32.4930, -100.2463
Nearby power plants
- Hecate Energy Harley Hand Solar LLCSolar farms · 514 MW · 2.4 mi
- Trent Wind FarmWind farms · 152 MW · 4.4 mi
- South Trent Wind FarmWind farms · 101 MW · 9.0 mi
- Indigo Solar & StorageSolar farms, Battery storage · 330 MW · 9.4 mi
- Sweetwater Wind 1 LLCWind farms · 37.5 MW · 10.6 mi
- Sweetwater BESSBattery storage · 10.0 MW · 11.8 mi
- Sweetwater Wind 2 LLCWind farms · 98.8 MW · 12.4 mi
- Buffalo Gap 2 Wind FarmWind farms · 233 MW · 12.7 mi
- Buffalo Gap Wind FarmWind farms · 121 MW · 16.5 mi
- Buffalo Gap 3 Wind FarmWind farms · 170 MW · 16.5 mi
Source: U.S. Energy Information Administration, Form EIA-860M, September 2026. Planned dates are targets reported by the developer and often change. Report a problem