United States βΊ Power plants βΊ Solar farms βΊ Texas
SOLAR FARMSPease River Solar
Pease River Solar is a 300 MW planned solar farm in Foard County, Texas, operated by Pease River Solar LLC.
Plant statusIn planning
- Planning (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingTarget Dec 2030 (not yet reached)
- Closed (not yet reached)
Planned start of operation reported to EIA: Dec 2030.
Generators
Each generating unit EIA lists at this plant.
| Unit | Technology | Capacity | Status |
|---|---|---|---|
| 58441 | Solar Photovoltaic | 300 MW | Planned, approvals not yet sought |
Plant details
- Operator
- Pease River Solar LLC
- Location
- Foard County, Texas
- Balancing authority
- ERCO
- Sector
- IPP Non-CHP
- Capacity
- Planned: 300 MW
- EIA plant ID
- 69644
Location
33.9920, -99.6928
Nearby power plants
- Foard City WindWind farms Β· 353 MW Β· 6.0 mi
- Montgomery Ranch Wind Farm, LLCWind farms Β· 203 MW Β· 10.6 mi
- Blue Summit III WindWind farms Β· 200 MW Β· 14.4 mi
- TG EastWind farms Β· 336 MW Β· 17.0 mi
- El Campo WindWind farms Β· 243 MW Β· 18.1 mi
- Blue Summit II WindWind farms Β· 99.4 MW Β· 20.3 mi
- Lazy U ESS 1Battery storage Β· 250 MW Β· 21.5 mi
- Lazy U ESS 2Battery storage Β· 250 MW Β· 21.5 mi
- Lazy U Solar 1Solar farms Β· 250 MW Β· 21.5 mi
- Lazy U Solar 2Solar farms Β· 250 MW Β· 21.5 mi
Source: U.S. Energy Information Administration, Form EIA-860M, September 2026. Planned dates are targets reported by the developer and often change. Report a problem