United States βΊ Power plants βΊ Solar farms βΊ Texas
SOLAR FARMSAbeja Solar Farm
Abeja Solar Farm is a 200 MW planned solar farm in Bee County, Texas, operated by Abeja Solar Farm LLC.
Plant statusIn planning
- Planning (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingTarget Jul 2028 (not yet reached)
- Closed (not yet reached)
Planned start of operation reported to EIA: Jul 2028.
Generators
Each generating unit EIA lists at this plant.
| Unit | Technology | Capacity | Status |
|---|---|---|---|
| ABPV1 | Solar Photovoltaic | 200 MW | Planned, approvals not yet sought |
Plant details
- Operator
- Abeja Solar Farm LLC
- Location
- Bee County, Texas
- Balancing authority
- ERCO
- Sector
- IPP Non-CHP
- Capacity
- Planned: 200 MW
- EIA plant ID
- 68347
Location
28.2882, -97.8402
Nearby power plants
- Karankawa Wind LLCWind farms Β· 307 MW Β· 8.3 mi
- TynanBattery storage Β· 9.9 MW Β· 8.3 mi
- Honeycomb Solar and StorageSolar farms, Battery storage Β· 151 MW Β· 8.3 mi
- Bird Dog Energy StorageBattery storage Β· 60.0 MW Β· 9.1 mi
- BrightsideSolar farms Β· 50.7 MW Β· 10.3 mi
- Myers Solar and StorageSolar farms, Battery storage Β· 177 MW Β· 12.1 mi
- Blackjack Creek Wind FarmWind farms Β· 240 MW Β· 20.1 mi
- El Algodon Alto Wind Farm, LLCWind farms Β· 200 MW Β· 21.2 mi
- Helena WindWind farms Β· 268 MW Β· 23.8 mi
- Ray Ranch SolarSolar farms Β· 255 MW Β· 24.5 mi
Source: U.S. Energy Information Administration, Form EIA-860M, September 2026. Planned dates are targets reported by the developer and often change. Report a problem