United States › Power plants › Solar farms › Texas
SOLAR FARMSAccalia Point Solar, LLC
Accalia Point Solar, LLC is a 191 MW planned solar farm in Cameron County, Texas, operated by Accalia Point Solar, LLC.
Plant statusIn planning
- Planning (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingTarget May 2028 (not yet reached)
- Closed (not yet reached)
Planned start of operation reported to EIA: May 2028.
Generators
Each generating unit EIA lists at this plant.
| Unit | Technology | Capacity | Status |
|---|---|---|---|
| 66666 | Solar Photovoltaic | 191 MW | Planned, approvals not yet sought |
Plant details
- Operator
- Accalia Point Solar, LLC
- Location
- Cameron County, Texas
- Balancing authority
- ERCO
- Sector
- IPP Non-CHP
- Capacity
- Planned: 191 MW
- EIA plant ID
- 66673
Location
26.0981, -97.8375
Nearby power plants
- Mesquite Clean Energy Center (BESS)Battery storage · 10.1 MW · 0.9 mi
- BESS La FeriaBattery storage · 10.0 MW · 2.1 mi
- Nebula SolarSolar farms · 135 MW · 2.5 mi
- Vancourt Solar InterconnectionsSolar farms · 45.0 MW · 2.5 mi
- SMT Harlingen II LLCBattery storage · 10.0 MW · 9.0 mi
- Santa RosaOil-fired power plants · 9.0 MW · 9.2 mi
- SMT Santa Rosa LLCBattery storage · 10.0 MW · 9.3 mi
- SMT Mercedes LLCBattery storage · 10.0 MW · 10.3 mi
- Citrus Flatts Energy Center, LLCBattery storage · 100 MW · 10.9 mi
- Harlingen #1 BESS 1Battery storage · 10.0 MW · 10.9 mi
Source: U.S. Energy Information Administration, Form EIA-860M, September 2026. Planned dates are targets reported by the developer and often change. Report a problem