United States › Power plants › Battery storage › Texas
BATTERY STORAGEHarlingen #1 BESS 1
Harlingen #1 BESS 1 is a 10.0 MW under construction battery storage site in Cameron County, Texas, operated by Harlingen ESS Assets LLC.
Plant statusUnder construction
- Planning (completed)
- Consented (completed)
- Construction (current stage)
- OperatingTarget Nov 2026 (not yet reached)
- Closed (not yet reached)
Planned start of operation reported to EIA: Nov 2026.
Generators
Each generating unit EIA lists at this plant.
| Unit | Technology | Capacity | Status |
|---|---|---|---|
| HABA1 | Batteries | 10 MW | Under construction (over 50%) |
Plant details
- Operator
- Harlingen ESS Assets LLC
- Location
- Cameron County, Texas
- Balancing authority
- ERCO
- Sector
- IPP Non-CHP
- Capacity
- Under construction: 10.0 MW
- EIA plant ID
- 69252
Location
26.2061, -97.7084
Nearby power plants
- Citrus Flatts Energy Center, LLCBattery storage · 100 MW · 1.3 mi
- SMT Harlingen II LLCBattery storage · 10.0 MW · 2.1 mi
- E. Porte Ct.Oil-fired power plants · 9.0 MW · 2.9 mi
- Aggreko MSR Grid PC5Battery storage · 10.0 MW · 3.1 mi
- VaqueroOil-fired power plants · 9.0 MW · 4.3 mi
- Harryoung PV and BESSSolar farms, Battery storage · 380 MW · 6.7 mi
- Arroyo StorageBattery storage · 180 MW · 7.2 mi
- Santa RosaOil-fired power plants · 9.0 MW · 7.3 mi
- SMT Santa Rosa LLCBattery storage · 10.0 MW · 7.3 mi
- BESS La FeriaBattery storage · 10.0 MW · 8.9 mi
Source: U.S. Energy Information Administration, Form EIA-860M, September 2026. Planned dates are targets reported by the developer and often change. Report a problem