United States βΊ Power plants βΊ Solar farms βΊ Texas
SOLAR FARMSCazadores Solar
Cazadores Solar is a 300 MW planned solar farm in Duval County, Texas, operated by Cazadores Solar LLC.
Plant statusIn planning
- Planning (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingTarget Dec 2029 (not yet reached)
- Closed (not yet reached)
Planned start of operation reported to EIA: Dec 2029.
Generators
Each generating unit EIA lists at this plant.
| Unit | Technology | Capacity | Status |
|---|---|---|---|
| 73509 | Solar Photovoltaic | 300 MW | Planned, approvals not yet sought |
Plant details
- Operator
- Cazadores Solar LLC
- Location
- Duval County, Texas
- Balancing authority
- ERCO
- Sector
- IPP Non-CHP
- Capacity
- Planned: 300 MW
- EIA plant ID
- 69640
Location
27.3922, -98.5011
Nearby power plants
- Mars SolarSolar farms Β· 10.0 MW Β· 20.6 mi
- Torrecillas Wind Energy, LLCWind farms Β· 300 MW Β· 23.6 mi
- Falfurrias BESSBattery storage Β· 9.9 MW Β· 24.4 mi
- Regis FalfurriasBattery storage Β· 9.9 MW Β· 24.5 mi
- Javelina Wind Energy II, LLCWind farms Β· 200 MW Β· 25.3 mi
- Torrecillas Energy StorageBattery storage Β· 9.9 MW Β· 26.0 mi
- Cedro Hill Wind LLCWind farms Β· 300 MW Β· 27.8 mi
- SenderoWind farms Β· 78.0 MW Β· 29.4 mi
- Javelina Wind Energy, LLCWind farms Β· 250 MW Β· 31.0 mi
- WhitetailWind farms Β· 92.0 MW Β· 31.6 mi
Source: U.S. Energy Information Administration, Form EIA-860M, September 2026. Planned dates are targets reported by the developer and often change. Report a problem