United States › Power plants › Battery storage › Texas
BATTERY STORAGE · SOLAR FARMSCuchillas PV and BESS
Cuchillas PV and BESS is a 613 MW planned power plant in Webb County, Texas, operated by Gransolar Texas Two LLC.
Plant statusIn planning
- Planning (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingTarget Dec 2028 (not yet reached)
- Closed (not yet reached)
Planned start of operation reported to EIA: Dec 2028.
Generators
Each generating unit EIA lists at this plant.
| Unit | Technology | Capacity | Status |
|---|---|---|---|
| GRS2B | Batteries | 307 MW | Regulatory approvals pending |
| GRS2P | Solar Photovoltaic | 306 MW | Regulatory approvals pending |
Plant details
- Operator
- Gransolar Texas Two LLC
- Location
- Webb County, Texas
- Balancing authority
- ERCO
- Sector
- IPP Non-CHP
- Capacity
- Planned: 613 MW
- EIA plant ID
- 67776
Location
27.6442, -99.1845
Nearby power plants
- Corazon Energy LLCSolar farms · 200 MW · 4.6 mi
- Guajillo Energy StorageBattery storage · 229 MW · 5.1 mi
- Wolf Tank StorageBattery storage · 150 MW · 7.3 mi
- Hecate Energy Outpost Solar LLCSolar farms · 515 MW · 14.9 mi
- WhitetailWind farms · 92.0 MW · 15.4 mi
- WAL5713Gas power plants · 1.2 MW · 17.2 mi
- WAL3518Gas power plants · 1.2 MW · 17.7 mi
- Cedro Hill Wind LLCWind farms · 300 MW · 17.7 mi
- HEB00095Gas power plants · 1.6 MW · 17.9 mi
- Seven Flags BESS LLCBattery storage · 100 MW · 19.3 mi
Source: U.S. Energy Information Administration, Form EIA-860M, September 2026. Planned dates are targets reported by the developer and often change. Report a problem