ONSHORE WIND Β· WEST

Onshore wind project 30, Whitman County

Onshore wind project 30, Whitman County is a 50.0 MW onshore wind request withdrawn in the West interconnection queue, in Whitman County, Washington, connecting to Avista Utilities.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Dec 2010 (completed)
  2. Withdrawn / abandonedFeb 2011 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
30
Grid region
West (non-ISO utilities)
Utility / transmission owner
Avista Utilities
Connection point (POI)
Lind-Shawnee 115 kV line
Location
Whitman County, Washington
Technology
Wind: 50.0 MW
Total requested
50.0 MW
Service type
NRIS and ERIS
Queue status
Withdrawn
Entered queue
28 December 2010
Proposed online date
July 2013
Withdrawn
February 2011

Location

Marker shows the centre of Whitman County; the queue data does not give exact sites.

Power plants in Washington Β· Transmission lines in Washington

Other requests in Whitman County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem