United States β€Ί Grid β€Ί Interconnection queues β€Ί Washington

ONSHORE WIND Β· WEST

Onshore wind project 5, Whitman County

Onshore wind project 5, Whitman County is a 75.0 MW onshore wind request withdrawn in the West interconnection queue, in Whitman County, Washington, connecting to Avista Utilities.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Jul 2007 (completed)
  2. Withdrawn / abandonedFeb 2009 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
5
Grid region
West (non-ISO utilities)
Utility / transmission owner
Avista Utilities
Connection point (POI)
Shawnee-Sunset 115 kV line near Rosalia
Location
Whitman County, Washington
Technology
Wind: 75.0 MW
Total requested
75.0 MW
Service type
NRIS and ERIS
Queue status
Withdrawn
Entered queue
11 July 2007
Proposed online date
October 2009
Withdrawn
February 2009

Location

Marker shows the centre of Whitman County; the queue data does not give exact sites.

Power plants in Washington Β· Transmission lines in Washington

Other requests in Whitman County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem