United States › Grid › Interconnection queues › Washington
BATTERY STORAGE · WESTBattery storage project 42, Whitman County
Battery storage project 42, Whitman County is a 1.2 MW battery storage request built and operating in the West interconnection queue, in Whitman County, Washington, connecting to Avista Utilities.
Request details
- Queue ID
- 42
- Grid region
- West (non-ISO utilities)
- Utility / transmission owner
- Avista Utilities
- Connection point (POI)
- Avista distribution system on the Avista Turner Substation feeder 117 at or near the Schweitzer Engineering Laboratory’s (SEL) parking lot #27 complex in Whitman County Washington
- Location
- Whitman County, Washington
- Technology
- Battery: 1.2 MW
- Total requested
- 1.2 MW
- Service type
- Network resource (NRIS)
- Study phase
- IA Executed
- Queue status
- Operational
- Entered queue
- 5 November 2014
- Proposed online date
- January 2015
Location
Marker shows the centre of Whitman County; the queue data does not give exact sites.
Power plants in Washington · Transmission lines in Washington
Other requests in Whitman County
- Onshore wind project CS23-06, Whitman CountyOnshore wind · 221 MW · agreement signed
- Onshore wind project CS25-07, Whitman CountyOnshore wind · 199 MW · in study
- Onshore wind project 17, Whitman CountyOnshore wind · 100 MW · built
- Onshore wind project 14, Whitman CountyOnshore wind · 210 MW · withdrawn
- Gas project 35, Whitman CountyGas · 200 MW · withdrawn
- Onshore wind project 31, Whitman CountyOnshore wind · 150 MW · withdrawn
- Onshore wind project 36, Whitman CountyOnshore wind · 105 MW · withdrawn
- Solar + storage project CS23-11, Whitman CountySolar + storage · 100 MW · withdrawn
- Onshore wind project 32, Whitman CountyOnshore wind · 100 MW · withdrawn
- Solar project CS24-13, Whitman CountySolar · 95.0 MW · withdrawn
- Onshore wind project 5, Whitman CountyOnshore wind · 75.0 MW · withdrawn
- Solar project CS24-11, Whitman CountySolar · 70.0 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem