United States › Grid › Interconnection queues › Washington

ONSHORE WIND · WEST

Onshore wind project CS25-07, Whitman County

Onshore wind project CS25-07, Whitman County is a 199 MW onshore wind request in interconnection study in the West interconnection queue, in Whitman County, Washington, connecting to Avista Utilities.

Queue statusIn planning
  1. PlanningQueued Apr 2025 (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingTarget Dec 2029 (not yet reached)
  5. Closed (not yet reached)

Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.

Request details

Queue ID
CS25-07
Grid region
West (non-ISO utilities)
Utility / transmission owner
Avista Utilities
Connection point (POI)
Thornton 230kV Station
Location
Whitman County, Washington
Technology
Wind: 199 MW
Total requested
199 MW
Service type
Network resource (NRIS)
Study phase
Request Status: Phase Two Study; Phase One Cluster Study: Complete; Phase One Re-Study: Complete; Phase Two Cluster Stud
Queue status
Active
Entered queue
30 April 2025
Proposed online date
December 2029

Location

Marker shows the centre of Whitman County; the queue data does not give exact sites.

Power plants in Washington · Transmission lines in Washington

Other requests in Whitman County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem