United States β€Ί Grid β€Ί Interconnection queues β€Ί Washington

ONSHORE WIND Β· WEST

Onshore wind project 31, Whitman County

Onshore wind project 31, Whitman County is a 150 MW onshore wind request withdrawn in the West interconnection queue, in Whitman County, Washington, connecting to Avista Utilities.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Feb 2011 (completed)
  2. Withdrawn / abandonedNov 2011 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
31
Grid region
West (non-ISO utilities)
Utility / transmission owner
Avista Utilities
Connection point (POI)
Lind-Shawnee 115 kV line
Location
Whitman County, Washington
Technology
Wind: 150 MW
Total requested
150 MW
Service type
NRIS and ERIS
Queue status
Withdrawn
Entered queue
11 February 2011
Proposed online date
July 2014
Withdrawn
November 2011

Location

Marker shows the centre of Whitman County; the queue data does not give exact sites.

Power plants in Washington Β· Transmission lines in Washington

Other requests in Whitman County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem