ONSHORE WIND Β· WESTOnshore wind project 32, Whitman County
Onshore wind project 32, Whitman County is a 100 MW onshore wind request withdrawn in the West interconnection queue, in Whitman County, Washington, connecting to Avista Utilities.
Queue statusWithdrawn / abandoned
- PlanningQueued Feb 2011 (completed)
- Withdrawn / abandonedMay 2012 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 32
- Grid region
- West (non-ISO utilities)
- Utility / transmission owner
- Avista Utilities
- Connection point (POI)
- Benewah-Shawnee 230 kV
- Location
- Whitman County, Washington
- Technology
- Wind: 100 MW
- Total requested
- 100 MW
- Service type
- NRIS and ERIS
- Queue status
- Withdrawn
- Entered queue
- 18 February 2011
- Proposed online date
- November 2012
- Withdrawn
- May 2012
Location
Marker shows the centre of Whitman County; the queue data does not give exact sites.
Power plants in Washington Β· Transmission lines in Washington
Other requests in Whitman County
- Onshore wind project CS23-06, Whitman CountyOnshore wind Β· 221 MW Β· agreement signed
- Onshore wind project CS25-07, Whitman CountyOnshore wind Β· 199 MW Β· in study
- Onshore wind project 17, Whitman CountyOnshore wind Β· 100 MW Β· built
- Battery storage project 42, Whitman CountyBattery storage Β· 1.2 MW Β· built
- Onshore wind project 14, Whitman CountyOnshore wind Β· 210 MW Β· withdrawn
- Gas project 35, Whitman CountyGas Β· 200 MW Β· withdrawn
- Onshore wind project 31, Whitman CountyOnshore wind Β· 150 MW Β· withdrawn
- Onshore wind project 36, Whitman CountyOnshore wind Β· 105 MW Β· withdrawn
- Solar + storage project CS23-11, Whitman CountySolar + storage Β· 100 MW Β· withdrawn
- Solar project CS24-13, Whitman CountySolar Β· 95.0 MW Β· withdrawn
- Onshore wind project 5, Whitman CountyOnshore wind Β· 75.0 MW Β· withdrawn
- Solar project CS24-11, Whitman CountySolar Β· 70.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem