United States β€Ί Grid β€Ί Interconnection queues β€Ί Washington

ONSHORE WIND Β· WEST

Onshore wind project 14, Whitman County

Onshore wind project 14, Whitman County is a 210 MW onshore wind request withdrawn in the West interconnection queue, in Whitman County, Washington, connecting to Avista Utilities.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Feb 2008 (completed)
  2. Withdrawn / abandonedOct 2011 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
14
Grid region
West (non-ISO utilities)
Utility / transmission owner
Avista Utilities
Connection point (POI)
North Lewiston-Shawnee 230 kV
Location
Whitman County, Washington
Technology
Wind: 210 MW
Total requested
210 MW
Service type
NRIS and ERIS
Queue status
Withdrawn
Entered queue
12 February 2008
Proposed online date
October 2010
Withdrawn
October 2011

Location

Marker shows the centre of Whitman County; the queue data does not give exact sites.

Power plants in Washington Β· Transmission lines in Washington

Other requests in Whitman County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem