πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content

United States β€Ί Grid β€Ί Interconnection queues β€Ί Washington

SOLAR Β· WEST

Solar project CS24-13, Whitman County

Solar project CS24-13, Whitman County is a 95.0 MW solar request withdrawn in the West interconnection queue, in Whitman County, Washington, connecting to Avista Utilities.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Apr 2024 (completed)
  2. Withdrawn / abandonedMar 2025 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
CS24-13
Grid region
West (non-ISO utilities)
Utility / transmission owner
Avista Utilities
Connection point (POI)
Benewah-Thornton 230kV
Location
Whitman County, Washington
Technology
Solar: 95.0 MW
Total requested
95.0 MW
Service type
NRIS and ERIS
Study phase
Request Status: Withdrawn; Phase One Cluster Study: Complete; Phase One Re-Study: Complete; Phase Two Cluster Study: Com
Queue status
Withdrawn
Entered queue
30 April 2024
Proposed online date
October 2027
Withdrawn
March 2025

Location

Marker shows the centre of Whitman County; the queue data does not give exact sites.

Power plants in Washington Β· Transmission lines in Washington

Other requests in Whitman County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem