United States β€Ί Grid β€Ί Interconnection queues β€Ί Wisconsin

GAS Β· MISO

Gas project J389, Rock County

Gas project J389, Rock County is a 550 MW gas request withdrawn in the MISO interconnection queue, in Rock County, Wisconsin.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Sep 2014 (completed)
  2. Withdrawn / abandonedJun 2015 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
J389
Grid region
MISO (Midcontinent)
Connection point (POI)
Unknown
Location
Rock County, Wisconsin
Technology
Gas: 550 MW
Total requested
550 MW
Study phase
Feasibility
Queue status
Withdrawn
Entered queue
15 September 2014
Withdrawn
June 2015

Location

Marker shows the centre of Rock County; the queue data does not give exact sites.

Power plants in Wisconsin Β· Transmission lines in Wisconsin

Other requests in Rock County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem