πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content

United States β€Ί Grid β€Ί Interconnection queues β€Ί Wisconsin

ONSHORE WIND Β· MISO

Onshore wind project J600, Rock County

Onshore wind project J600, Rock County is a 150 MW onshore wind request withdrawn in the MISO interconnection queue, in Rock County, Wisconsin.

Queue statusWithdrawn / abandoned
  1. PlanningQueued May 2016 (completed)
  2. Withdrawn / abandonedJun 2017 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
J600
Grid region
MISO (Midcontinent)
Connection point (POI)
Unknown
Location
Rock County, Wisconsin
Technology
Wind: 150 MW
Total requested
150 MW
Study phase
Feasibility
Queue status
Withdrawn
Entered queue
9 May 2016
Proposed online date
September 2018
Withdrawn
June 2017

Location

Marker shows the centre of Rock County; the queue data does not give exact sites.

Power plants in Wisconsin Β· Transmission lines in Wisconsin

Other requests in Rock County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem