Completed queue projects in Texas (2016 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown183,556 MW
Active in queue2,229 MW12 requests
Agreement signed1,297 MW8 requests
Withdrawn356,196 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

18 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Foard City Wind
Onshore wind Β· Innergex
350 MWOperating Foard, TXERCOT Oct 20162019
Sage Draw Wind
Onshore wind Β· Lincoln Clean
338 MWOperating Lynn, TXERCOT Mar 20162022
Lacy Creek wind
Wind + storage Β· Lacy Creek Wind, LLC
301 MWOperating Glasscock, TXERCOT Oct 20162024
Tahoka Wind
Onshore wind Β· Lincoln Clean
300 MWOperating Lynn, TXERCOT Mar 20162019
Oveja Wind
Onshore wind Β· Invenergy
300 MWOperating Irion, TXERCOT Jul 20162021
Misae Solar
Solar Β· CIP
241 MWOperating Childress, TXERCOT Oct 20162021
Formosa Increase
Gas Β· Formosa Plastics
240 MWOperating Calhoun, TXERCOT Sep 20162023
Long Draw Solar
Solar Β· ENGIE
227 MWOperating Borden, TXERCOT Dec 20162021
Holstein Solar
Solar Β· Holstein Solar
205 MWOperating Nolan, TXERCOT Jul 20162020
Barrow Ranch Wind
Onshore wind Β· Engie
160 MWOperating Andrews, TXERCOT Oct 20162021
Fowler Ranch
Solar Β· CED Crane Solar, LLC
153 MWOperating Crane, TXERCOT Oct 20162020
Mustang Creek Solar
Solar Β· Ganado Solar, LLC
151 MWOperating Jackson, TXERCOT Nov 20162023
Palmas Altas Wind
Onshore wind Β· Acciona
145 MWOperating Cameron, TXERCOT Mar 20162020
Tavener Solar
Solar Β· Fort Bend Solar LLC
144 MWOperating Fort Bend, TXERCOT Dec 20162023
CityVict
Gas Β· Castleman Power
100 MWOperating Refugio, TXERCOT Aug 20162020
VictPort
Gas Β· Castleman Power
100 MWOperating Calhoun, TXERCOT Apr 20162019
Tavener 2
Solar
98.0 MWOperating Fort Bend, TXERCOT Dec 20162023
Onshore wind project GEN-2016-070, Carson County
Onshore wind
5.3 MWOperating Carson, TXSPP Mar 20162020

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)