United States βΊ Grid βΊ Interconnection queues βΊ Texas
OCTARY USA Β· INTERCONNECTION QUEUESCompleted queue projects in Texas (2016 requests)
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Foard City Wind Onshore wind Β· Innergex |
350 MW | |
| Sage Draw Wind Onshore wind Β· Lincoln Clean |
338 MW | |
| Lacy Creek wind Wind + storage Β· Lacy Creek Wind, LLC |
301 MW | |
| Tahoka Wind Onshore wind Β· Lincoln Clean |
300 MW | |
| Oveja Wind Onshore wind Β· Invenergy |
300 MW | |
| Misae Solar Solar Β· CIP |
241 MW | |
| Formosa Increase Gas Β· Formosa Plastics |
240 MW | |
| Long Draw Solar Solar Β· ENGIE |
227 MW | |
| Holstein Solar Solar Β· Holstein Solar |
205 MW | |
| Barrow Ranch Wind Onshore wind Β· Engie |
160 MW | |
| Fowler Ranch Solar Β· CED Crane Solar, LLC |
153 MW | |
| Mustang Creek Solar Solar Β· Ganado Solar, LLC |
151 MW | |
| Palmas Altas Wind Onshore wind Β· Acciona |
145 MW | |
| Tavener Solar Solar Β· Fort Bend Solar LLC |
144 MW | |
| CityVict Gas Β· Castleman Power |
100 MW | |
| VictPort Gas Β· Castleman Power |
100 MW | |
| Tavener 2 Solar |
98.0 MW | |
| Onshore wind project GEN-2016-070, Carson County Onshore wind |
5.3 MW |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)