United States βΊ Grid βΊ Interconnection queues βΊ Rhode Island
OCTARY USA Β· INTERCONNECTION QUEUESCompleted queue projects in Rhode Island
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Manchester Street Station increase Gas |
492 MW | |
| Tiverton Uprate Gas |
306 MW | |
| RISEP Increase Gas |
66.0 MW | |
| GD 1-9 Iron Mine Solar Solar |
38.4 MW | |
| University Solar Solar |
31.3 MW | |
| Block Island Wind Farm Onshore wind |
29.0 MW | |
| Rhode Island Landfill Gas Genco Other |
27.9 MW | |
| Tiverton Power LLC Upgrade Gas |
21.5 MW | |
| Johnston Landfill Wind Onshore wind |
21.0 MW | |
| Solar Solar |
20.0 MW | |
| Solar Solar |
16.3 MW | |
| Alton Solar Solar |
13.9 MW | |
| Manchester Street Station Exciter Upgrades & incre Gas |
12.0 MW | |
| Solar Solar |
10.0 MW | |
| Brayton Road Solar Solar |
8.4 MW | |
| Chase Hill Substation - NG Western RI DG Area Study Solar |
6.8 MW | |
| Ridgewood RI Generation Phase I Other |
4.2 MW | |
| Brayton Road Solar Solar |
3.4 MW |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)