Completed queue projects in Rhode Island

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown181,128 MW
Active in queue982 MW3 requests
Agreement signed982 MW3 requests
Withdrawn9110.2 GW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

18 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Manchester Street Station increase
Gas
492 MWOperating Providence, RIISO-NE May 2010target 2010
Tiverton Uprate
Gas
306 MWOperating Newport, RIISO-NE Mar 2020target 2021
RISEP Increase
Gas
66.0 MWOperating Providence, RIISO-NE May 2010target 2012
GD 1-9 Iron Mine Solar
Solar
38.4 MWOperating Providence, RIISO-NE Jan 2019target 2022
University Solar
Solar
31.3 MWOperating Kent, RIISO-NE Nov 2017target 2020
Block Island Wind Farm
Onshore wind
29.0 MWOperating Washington, RIISO-NE Jan 2013target 2016
Rhode Island Landfill Gas Genco
Other
27.9 MWOperating Providence, RIISO-NE Nov 2007target 2013
Tiverton Power LLC Upgrade
Gas
21.5 MWOperating Newport, RIISO-NE Feb 2015target 2016
Johnston Landfill Wind
Onshore wind
21.0 MWOperating Providence, RIISO-NE Nov 2017target 2018
Solar
Solar
20.0 MWOperating Kent, RIISO-NE Feb 2019target 2023
Solar
Solar
16.3 MWOperating Providence, RIISO-NE Nov 2017target 2019
Alton Solar
Solar
13.9 MWOperating Washington, RIISO-NE Nov 2017target 2020
Manchester Street Station Exciter Upgrades & incre
Gas
12.0 MWOperating Providence, RIISO-NE Jul 2010target 2011
Solar
Solar
10.0 MWOperating Providence, RIISO-NE May 2018target 2019
Brayton Road Solar
Solar
8.4 MWOperating Newport, RIISO-NE Dec 2019target 2024
Chase Hill Substation - NG Western RI DG Area Study
Solar
6.8 MWOperating Washington, RIISO-NE Mar 2020target 2021
Ridgewood RI Generation Phase I
Other
4.2 MWOperating Providence, RIISO-NE Mar 2003target 2004
Brayton Road Solar
Solar
3.4 MWOperating Newport, RIISO-NE Dec 2019target 2024

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)