United States βΊ Grid βΊ Interconnection queues βΊ Connecticut
OCTARY USA Β· INTERCONNECTION QUEUESWithdrawn queue requests in Connecticut (2024 requests)
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Offshore Wind Offshore wind |
1,275 MW | Withdrawn / abandoned |
| Offshore Wind Offshore wind |
1,275 MW | Withdrawn / abandoned |
| Battery Storage Battery storage |
300 MW | Withdrawn / abandoned |
| Battery Storage Battery storage |
238 MW | Withdrawn / abandoned |
| Battery Storage Battery storage |
167 MW | Withdrawn / abandoned |
| Battery Storage Battery storage |
167 MW | Withdrawn / abandoned |
| Battery Storage Battery storage |
142 MW | Withdrawn / abandoned |
| Battery Storage Battery storage |
135 MW | Withdrawn / abandoned |
| Battery Storage Battery storage |
133 MW | Withdrawn / abandoned |
| Battery Storage Battery storage |
125 MW | Withdrawn / abandoned |
| Battery Storage Battery storage |
110 MW | Withdrawn / abandoned |
| Battery Storage addition(QP1192) Solar + storage |
101 MW | Withdrawn / abandoned |
| Battery Storage Battery storage |
93.2 MW | Withdrawn / abandoned |
| Battery Storage Battery storage |
45.3 MW | Withdrawn / abandoned |
| Solar Increase Solar |
25.0 MW | Withdrawn / abandoned |
| EE CT DER Group Study Battery storage |
20.0 MW | Withdrawn / abandoned |
| EE CT DER Group Study Battery storage |
20.0 MW | Withdrawn / abandoned |
| EE Mansfield Center DG Cluster Solar |
20.0 MW | Withdrawn / abandoned |
| EE Mansfield Center DG Cluster Solar + storage |
10.8 MW | Withdrawn / abandoned |
| EE CT DER Group Study Battery storage |
5.0 MW | Withdrawn / abandoned |
| EE CT DER Group Study Battery storage |
5.0 MW | Withdrawn / abandoned |
| EE CT DG Group Study Solar |
5.0 MW | Withdrawn / abandoned |
| EE CT DER Group Study Solar |
3.7 MW | Withdrawn / abandoned |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)