BATTERY STORAGE · ISO-NE

Battery Storage

Battery Storage is a 93.2 MW battery storage request withdrawn in the ISO-NE interconnection queue, in New London County, Connecticut.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Jun 2024 (completed)
  2. Withdrawn / abandonedSep 2025 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
1559
Grid region
ISO-NE (New England)
Connection point (POI)
115 kV line 1070 between Ft Hill Farms and Stockhouse Substations, interconnected by a new three-breaker ring bus approximately 2.5 miles from Ft Hill Farms substation and 5.2 miles from Stockhouse Su
Location
New London County, Connecticut
Technology
Battery: 93.2 MW
Total requested
93.2 MW
Service type
Network resource (NRIS)
Queue status
Withdrawn
Entered queue
6 June 2024
Proposed online date
May 2027
Withdrawn
September 2025

Location

No county location in the queue data.