๐Ÿ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more โ†’ Skip to main content

United States โ€บ Grid โ€บ Interconnection queues โ€บ California

OCTARY USA ยท INTERCONNECTION QUEUES

Withdrawn queue requests in California (2011 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown17523.0 GW
Active in queue971 MW5 requests
Agreement signed971 MW5 requests
Withdrawn17523.0 GW never built

Map

Loading requestsโ€ฆ
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

175 requests ยท page 1 of 4
ProjectCapacityStatusLocationRegionQueuedOnline
Eagle Mountain Pump Storage #3
Hydro
1,400 MWWithdrawn / abandoned Riverside, CACAISO Mar 2011target 2017
Suncrest Imperial Segs
Solar
1,080 MWWithdrawn / abandoned Imperial, CACAISO Mar 2011target 2015
Central Valley I Segs
Solar
1,080 MWWithdrawn / abandoned Kern, CACAISO Mar 2011target 2015
Kern Solar Ranch (Fka California Solar Ranch)
Solar
1,000 MWWithdrawn / abandoned Kern, CACAISO Mar 2011target 2018
WSP 3
Solar
800 MWWithdrawn / abandoned Kings, CACAISO Mar 2011target 2018
Jasper Segs (Fka Sonoran West II)
Solar
540 MWWithdrawn / abandoned San Bernardino, CACAISO Mar 2011target 2016
Central Valley II Segs
Solar
540 MWWithdrawn / abandoned Kern, CACAISO Mar 2011target 2015
Solar Four
Solar
510 MWWithdrawn / abandoned Imperial, CACAISO Mar 2011target 2017
Alta 15
Onshore wind
502 MWWithdrawn / abandoned Kern, CACAISO Mar 2011target 2014
Blythe Mesa Solar II
Solar
500 MWWithdrawn / abandoned Riverside, CACAISO Nov 2011target 2015
Mesa Solar
Solar
500 MWWithdrawn / abandoned Riverside, CACAISO Mar 2011target 2018
Madison Solar
Solar
500 MWWithdrawn / abandoned Kings, CACAISO Mar 2011target 2017
Calaveras Wind Project (100/383MW)
Other
483 MWWithdrawn / abandoned Kern, CACAISO Mar 2011target 2015
Black Rock 1,2,3,4, & 5,6
Geothermal
470 MWWithdrawn / abandoned Imperial, CACAISO Mar 2011target 2015
El Segundo Energy Center 2 ( Fka El Segundo Energy Center-II)
Gas
435 MWWithdrawn / abandoned Los Angeles, CACAISO Mar 2011target 2020
Hickory Solar Farm
Solar
400 MWWithdrawn / abandoned Imperial, CACAISO Mar 2011target 2014
Wellhead Power Kern 3
Gas
400 MWWithdrawn / abandoned Kern, CACAISO Mar 2011target 2015
Soldier Flat
Onshore wind
400 MWWithdrawn / abandoned Kern, CACAISO Mar 2011target 2015
Hydrogen Energy California ( Heca ) Project
Other
340 MWWithdrawn / abandoned Kern, CACAISO Nov 2011target 2017
Dunnigan
Onshore wind
301 MWWithdrawn / abandoned Yolo, CACAISO Mar 2011target 2014
Cordelia Hills Wind Power Plant
Onshore wind
301 MWWithdrawn / abandoned Napa, CACAISO Nov 2011target 2016
Desert Quartzite Solar
Solar
300 MWWithdrawn / abandoned Riverside, CACAISO Mar 2011target 2015
CPV North City
Gas
300 MWWithdrawn / abandoned San Diego, CACAISO Mar 2011target 2015
Re Oasis
Solar
300 MWWithdrawn / abandoned Riverside, CACAISO Mar 2011target 2014
Lone Tree Wind
Onshore wind
299 MWWithdrawn / abandoned Alameda, CACAISO Mar 2011target 2013
Loop Ranch Wind
Onshore wind
299 MWWithdrawn / abandoned Kern, CACAISO Mar 2011target 2013
Gran Vista
Solar + storage
279 MWWithdrawn / abandoned Kern, CACAISO Apr 2011target 2024
Sonoran West I Segs
Solar
270 MWWithdrawn / abandoned Riverside, CACAISO Mar 2011target 2016
Westlands Lemoore Solar
Solar
250 MWWithdrawn / abandoned Kings, CACAISO Mar 2011target 2014
Montezuma Wetlands
Onshore wind
250 MWWithdrawn / abandoned Solano, CACAISO Mar 2011target 2012
Onshore wind project Q23, San Bernardino County
Onshore wind
243 MWWithdrawn / abandoned San Bernardino, CAWest Nov 2011target 2017
Fort Mojave Solar Farms 2
Solar
240 MWWithdrawn / abandoned San Bernardino, CACAISO Mar 2011target 2013
SP Blythe 1
Solar
221 MWWithdrawn / abandoned Riverside, CACAISO Mar 2011target 2018
Onshore wind project Q22, San Bernardino County
Onshore wind
200 MWWithdrawn / abandoned San Bernardino, CAWest Nov 2011target 2016
Desert Bell Solar
Solar
200 MWWithdrawn / abandoned Riverside, CACAISO Mar 2011target 2014
Mount Signal Solar Farm III
Solar
200 MWWithdrawn / abandoned Imperial, CACAISO Mar 2011target 2014
Silurian Valley Wind
Onshore wind
200 MWWithdrawn / abandoned San Bernardino, CACAISO Mar 2011target 2015
Daggett Solar Project
Solar
200 MWWithdrawn / abandoned San Bernardino, CACAISO Mar 2011target 2018
Mojave View Solar
Solar
200 MWWithdrawn / abandoned Kern, CACAISO Mar 2011target 2013
Tulare Solar
Solar
150 MWWithdrawn / abandoned Tulare, CACAISO Mar 2011target 2014
Candlewood Wind
Onshore wind
150 MWWithdrawn / abandoned Imperial, CACAISO Mar 2011target 2013
Acorn Greenworks
Solar
150 MWWithdrawn / abandoned Imperial, CACAISO Mar 2011target 2021
Maricopa California Solar Farms II
Solar
150 MWWithdrawn / abandoned Kern, CACAISO Mar 2011target 2013
Wildflower Green Energy Farm- Solar
Solar
150 MWWithdrawn / abandoned Los Angeles, CACAISO Mar 2011target 2013
Monterey Wind
Onshore wind
150 MWWithdrawn / abandoned Monterey, CACAISO Mar 2011target 2013
Mule Mountain Solar Project
Solar
150 MWWithdrawn / abandoned Riverside, CACAISO Mar 2011target 2014
Silvertree Greenworks
Solar
150 MWWithdrawn / abandoned Imperial, CACAISO Mar 2011target 2014
Maricopa California Solar Farms I
Solar
150 MWWithdrawn / abandoned Kern, CACAISO Mar 2011target 2015
Solar project Q20, Inyo County
Solar
138 MWWithdrawn / abandoned Inyo, CAWest Oct 2011target 2014
Whitehorse Mountain Wind Power Plant
Onshore wind
132 MWWithdrawn / abandoned Siskiyou, CACAISO Nov 2011target 2016
Page 1 of 4

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines ยท Planned power plants (EIA)