United States โ€บ Grid โ€บ Interconnection queues โ€บ California

OCTARY USA ยท INTERCONNECTION QUEUES

Queue requests in study in California (2021 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown7221.6 GW
Active in queue53.2 GW136 requests
Agreement signed31.6 GW64 requests
Withdrawn21574.6 GW never built

Map

Loading requestsโ€ฆ
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

72 requests ยท page 1 of 2
ProjectCapacityStatusLocationRegionQueuedOnline
Plum
Solar + storage
1,560 MWIn study Kings, CACAISO Apr 2021target 2031
Invictus
Solar + storage
860 MWIn study Riverside, CACAISO Apr 2021target 2029
Artemis
Solar + storage
825 MWIn study Kern, CACAISO Apr 2021target 2029
Valley Sunlight Refinery
Solar + storage
821 MWIn study Kings, CACAISO Apr 2021target 2032
Solsken
Solar + storage
809 MWIn study Tulare, CACAISO Apr 2021target 2033
Yuha Desert Battery Storage
Battery storage
633 MWIn study Imperial, CACAISO Apr 2021target 2031
Cherry Lane Hybrid
Solar + storage
621 MWIn study Kern, CACAISO Apr 2021target 2031
Soleil Cantil
Solar + storage
597 MWIn study Kern, CACAISO Apr 2021target 2033
Solar + storage project Q80, Kern County
Solar + storage
590 MWIn study Kern, CAWest Apr 2021target 2024
Sagebrush Energy Storage
Battery storage
528 MWIn study Kern, CACAISO Apr 2021target 2033
Rosa Storage
Battery storage
512 MWIn study Ventura, CACAISO Apr 2021target 2034
Battery storage project Q84, San Bernardino County
Battery storage
500 MWIn study San Bernardino, CAWest Oct 2021target 2024
Corby 2
Battery storage
476 MWIn study Solano, CACAISO Apr 2021target 2031
Mineral King Solar
Solar + storage
430 MWIn study Tulare, CACAISO Apr 2021target 2029
Boulder Brush Hybrid
Wind + storage
420 MWIn study San Diego, CACAISO Apr 2021target 2031
Tolenas
Battery storage
417 MWIn study Solano, CACAISO Apr 2021target 2031
Lotus Solar 2
Solar + storage
406 MWIn study Madera, CACAISO Apr 2021target 2030
Simon
Battery storage
406 MWIn study Los Angeles, CACAISO Apr 2021target 2032
Coral Reef
Battery storage
406 MWIn study Los Angeles, CACAISO Apr 2021target 2032
Fleetwood
Battery storage
406 MWIn study Los Angeles, CACAISO Apr 2021target 2032
Dirac
Battery storage
403 MWIn study San Bernardino, CACAISO Apr 2021target 2031
Brushy
Battery storage
400 MWIn study Solano, CACAISO Apr 2021target 2031
Northeast Central Valley
Battery storage
365 MWIn study San Joaquin, CACAISO Apr 2021target 2031
Solar + storage project 8, Sacramento County
Solar + storage
344 MWIn study Sacramento, CAWest Jan 2021target 2026
Cargo Storage
Battery storage
313 MWIn study San Diego, CACAISO Apr 2021target 2036
Bell Bluff Storage
Battery storage
313 MWIn study San Diego, CACAISO Apr 2021target 2035
Harmony Storage 2
Battery storage
308 MWIn study Contra Costa, CACAISO Apr 2021target 2031
Juniper Storage
Solar + storage
307 MWIn study Los Angeles, CACAISO Apr 2021target 2033
Gnarly Osage
Battery storage
304 MWIn study San Diego, CACAISO Apr 2021target 2027
Onshore wind project Company LF, Lassen County
Onshore wind
300 MWPaused / redesign Lassen, CAWest Mar 2021target 2023
Battery storage project Q82, Los Angeles County
Battery storage
300 MWIn study Los Angeles, CAWest Jul 2021target 2024
Carmine
Battery storage
292 MWIn study Riverside, CACAISO Apr 2021target 2031
Almande Energy Storage
Battery storage
256 MWIn study Merced, CACAISO Apr 2021target 2030
Sherman Energy Storage
Battery storage
256 MWIn study Contra Costa, CACAISO Apr 2021target 2031
Gateway Energy Storage 2
Battery storage
256 MWIn study San Diego, CACAISO Apr 2021target 2035
Sandbar Energy Storage
Battery storage
256 MWIn study San Diego, CACAISO Apr 2021target 2030
Solar + storage project 12, Sacramento County
Solar + storage
250 MWIn study Sacramento, CAWest May 2021target 2028
Weston Storage
Battery storage
214 MWIn study San Bernardino, CACAISO Apr 2021target 2031
Frigatebird Storage
Battery storage
214 MWIn study San Diego, CACAISO Apr 2021target 2035
Phaenon
Solar + storage
204 MWIn study Kern, CACAISO Apr 2021target 2029
Puma Storage
Battery storage
204 MWIn study Madera, CACAISO Apr 2021target 2030
Everest Energy Storage
Battery storage
202 MWIn study Kern, CACAISO Apr 2021target 2030
Battery storage project Q81, Los Angeles County
Battery storage
200 MWIn study Los Angeles, CAWest May 2021target 2024
Merlin Storage
Battery storage
200 MWIn study Los Angeles, CACAISO Apr 2021target 2032
Battery storage project 11, Sacramento County
Battery storage
200 MWIn study Sacramento, CAWest Apr 2021target 2026
Buttercup Hybrid Solar
Solar + storage
197 MWIn study Merced, CACAISO Apr 2021target 2032
Solar + storage project GI-2021-149, Imperial County
Solar + storage
175 MWIn study Imperial, CAWest Nov 2021target 2024
Bobor Storage
Battery storage
152 MWIn study Tulare, CACAISO Apr 2021target 2030
Flores Storage
Battery storage
152 MWIn study Madera, CACAISO Apr 2021target 2031
Battery storage project GI-2021-145, Riverside County
Battery storage
125 MWIn study Riverside, CAWest Aug 2021target 2027
Page 1 of 2

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines ยท Planned power plants (EIA)