Projects with signed interconnection agreements in California

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown21581.7 GW
Active in queue179.2 GW464 requests
Agreement signed81.7 GW215 requests
Withdrawn2,138571.6 GW never built

Map

Loading requestsโ€ฆ
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

215 requests ยท page 1 of 5
ProjectCapacityStatusLocationRegionQueuedOnline
Darden
Solar + storage
2,365 MWAgreement signed Fresno, CACAISO Apr 2021target 2028
Umbriel
Solar + storage
2,365 MWAgreement signed Imperial, CACAISO Apr 2021target 2035
Wingtip Solar 1
Solar + storage
2,352 MWAgreement signed Merced, CACAISO Apr 2021target 2032
Angeleno Solar Farm
Solar + storage
2,300 MWAgreement signed Los Angeles, CACAISO Apr 2019target 2028
Holman
Wind + storage
2,282 MWAgreement signed Monterey, CACAISO Apr 2021target 2034
Sanborn Hybrid 3
Solar + storage
2,159 MWAgreement signed Kern, CACAISO Apr 2019target 2026
Buttonbush Solar Hybrid Energy Center
Solar + storage
1,636 MWAgreement signed Kern, CACAISO Apr 2019target 2026
Euismod
Solar + storage
1,247 MWAgreement signed Kern, CACAISO Apr 2021target 2028
Potentia-Viridi
Other
1,225 MWAgreement signed San Joaquin, CACAISO Apr 2020target 2028
Oberon
Solar + storage
1,037 MWAgreement signed Riverside, CACAISO Apr 2019target 2026
Windwalker Offshore
Offshore wind
1,029 MWAgreement signed San Luis Obispo, CACAISO Apr 2020target 2028
Sunbaked Solar
Solar + storage
1,024 MWAgreement signed Inyo, CACAISO Apr 2021target 2029
Descendant Ranch 1
Solar + storage
1,024 MWAgreement signed Colusa, CACAISO Apr 2018target 2034
Grace Energy Center
Solar + storage
1,017 MWAgreement signed Riverside, CACAISO Apr 2020target 2027
Bellefield Solar Farm
Solar + storage
1,000 MWAgreement signed Kern, CACAISO Apr 2018target 2025
Bellefield 2 Solar Farm
Solar + storage
1,000 MWAgreement signed Kern, CACAISO Apr 2019target 2024
Pelicans Jaw Hybrid Solar
Solar + storage
1,000 MWAgreement signed Kings, CACAISO Apr 2019target 2028
Easley
Solar + storage
940 MWAgreement signed Riverside, CACAISO Apr 2021target 2028
Athos Power Plant
Solar + storage
908 MWAgreement signed Riverside, CACAISO May 2017target 2027
Lycan Solar
Solar + storage
800 MWAgreement signed Riverside, CACAISO Apr 2019target 2030
Scarlet
Solar + storage
800 MWAgreement signed Fresno, CACAISO Apr 2015target 2025
Calypso Solar
Solar + storage
800 MWAgreement signed Riverside, CACAISO Apr 2019target 2031
Irving Storage
Battery storage
783 MWAgreement signed Monterey, CACAISO May 2019target 2025
Antelope Solar 2
Solar + storage
782 MWAgreement signed Los Angeles, CACAISO Apr 2015target 2025
Silver Ridge Mount Signal
Solar + storage
750 MWAgreement signed Imperial, CACAISO Aug 20062019
CPC West
Wind + storage
750 MWAgreement signed Kern, CACAISO Mar 20062011
Kingsley Solar Farm
Solar + storage
720 MWAgreement signed Imperial, CACAISO Apr 2019target 2030
Buttonbush Solar 2
Solar + storage
716 MWAgreement signed Kern, CACAISO Apr 2021target 2032
Presidio
Solar + storage
713 MWAgreement signed San Joaquin, CACAISO Apr 2021target 2030
Sanborn Solar 2
Solar + storage
707 MWAgreement signed Kern, CACAISO Apr 2018target 2025
Menifee Power Bank
Battery storage
680 MWAgreement signed Riverside, CACAISO Apr 2019target 2025
Steel City Battery Storage
Battery storage
675 MWAgreement signed Contra Costa, CACAISO Apr 2020target 2029
Cady Solar
Solar + storage
626 MWAgreement signed San Bernardino, CACAISO Apr 2021target 2031
Willow Rock Energy Storage
Other
620 MWAgreement signed Kern, CACAISO Apr 2020target 2030
Australis
Solar + storage
614 MWAgreement signed Merced, CACAISO Apr 2021target 2031
Daylight
Solar + storage
611 MWAgreement signed Kings, CACAISO May 2016target 2028
Cornucopia Hybrid
Solar + storage
605 MWAgreement signed Fresno, CACAISO Apr 2021target 2030
Twin Palms Solar
Solar + storage
576 MWAgreement signed Riverside, CACAISO Apr 2021target 2030
Sanborn 5 Hybrid
Solar
560 MWAgreement signed Kern, CACAISO Apr 2020target 2027
Rosamond West Solar
Solar + storage
555 MWAgreement signed Kern, CACAISO Jul 2009target 2029
Redonda
Solar + storage
542 MWAgreement signed Riverside, CACAISO Apr 2021target 2031
Daggett Solar 3
Solar + storage
522 MWAgreement signed San Bernardino, CACAISO May 2016target 2023
Alta Casa Storage
Battery storage
515 MWAgreement signed San Joaquin, CACAISO Apr 2021target 2031
Greasewood Energy Storage
Battery storage
513 MWAgreement signed Kern, CACAISO Apr 2021target 2033
Cobalt
Solar + storage
513 MWAgreement signed Riverside, CACAISO Apr 2020target 2027
Conduit Energy Storage
Battery storage
513 MWAgreement signed San Bernardino, CACAISO Apr 2021target 2031
Lock Storage
Battery storage
508 MWAgreement signed Fresno, CACAISO Apr 2021target 2027
Double Butte Storage
Battery storage
508 MWAgreement signed Riverside, CACAISO Apr 2019target 2030
Drifter Energy Storage
Battery storage
505 MWAgreement signed Ventura, CACAISO Apr 2021target 2033
Ocotillo Express
Wind + storage
504 MWAgreement signed Imperial, CACAISO Jul 20092013
Page 1 of 5

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines ยท Planned power plants (EIA)