United States βΊ Grid βΊ Interconnection queues
OCTARY USA Β· INTERCONNECTION QUEUESWithdrawn queue requests in ISO-NE (New England) (2012 requests)
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Combined Cycle Gas |
680 MW | Withdrawn / abandoned |
| Downeast Wind Onshore wind |
90.0 MW | Withdrawn / abandoned |
| Wind Onshore wind |
84.0 MW | Withdrawn / abandoned |
| Wind Onshore wind |
60.0 MW | Withdrawn / abandoned |
| Spruce Ridge Wind Farm Onshore wind |
50.8 MW | Withdrawn / abandoned |
| Wind Onshore wind |
19.8 MW | Withdrawn / abandoned |
| Solar Solar |
5.0 MW | Withdrawn / abandoned |
| Wind Onshore wind |
2.7 MW | Withdrawn / abandoned |
| Solar Solar |
2.2 MW | Withdrawn / abandoned |
| Wind Increase Onshore wind |
1.2 MW | Withdrawn / abandoned |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- PJM (Mid-Atlantic, Midwest)111 Β· 19.3 GW
- CAISO (California)60 Β· 12.3 GW
- West (non-ISO utilities)95 Β· 9,460 MW
- Southeast (non-ISO utilities)36 Β· 9,047 MW
- ERCOT (Texas)24 Β· 6,711 MW
- MISO (Midcontinent)21 Β· 6,395 MW
- SPP (Southwest Power Pool)30 Β· 4,307 MW
- NYISO (New York)10 Β· 1,963 MW
- ISO-NE (New England)10 Β· 996 MW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)