United States β€Ί Grid β€Ί Interconnection queues

OCTARY USA Β· INTERCONNECTION QUEUES

Withdrawn queue requests in ISO-NE (New England) (2011 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown141,774 MW
Active in queue0.0 MW0 requests
Agreement signed0.0 MW0 requests
Withdrawn141,774 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

14 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Combined Cycle
Gas
745 MWWithdrawn / abandoned Fairfield, CTISO-NE Jun 2011target 2016
CC Administrative Increase
Gas
550 MWWithdrawn / abandoned Hampden, MAISO-NE Aug 2011
Wind
Onshore wind
198 MWWithdrawn / abandoned Franklin, MEISO-NE Dec 2011target 2016
Wind
Onshore wind
80.0 MWWithdrawn / abandoned Merrimack, NHISO-NE Sep 2011target 2014
Wind
Onshore wind
79.9 MWWithdrawn / abandoned Oxford, MEISO-NE Dec 2011target 2014
Wind
Onshore wind
33.0 MWWithdrawn / abandoned Hillsborough, NHISO-NE Aug 2011target 2015
Combined Cycle Increase
Gas
20.2 MWWithdrawn / abandoned Berkshire, MAISO-NE Jan 2011target 2011
Grandpas Knob Wind
Onshore wind
20.0 MWWithdrawn / abandoned Rutland, VTISO-NE Mar 2011target 2016
Wind
Onshore wind
16.1 MWWithdrawn / abandoned Hillsborough, NHISO-NE May 2011target 2014
Wind
Onshore wind
11.9 MWWithdrawn / abandoned Lincoln, MEISO-NE Nov 2011target 2017
Solar
Solar
6.0 MWWithdrawn / abandoned Bristol, MAISO-NE Mar 2011target 2012
Solar
Solar
4.9 MWWithdrawn / abandoned Hampden, MAISO-NE Apr 2011target 2012
CornerStone Power Monson 2
Solar
4.9 MWWithdrawn / abandoned Hampden, MAISO-NE Oct 2011target 2014
Hydro
Hydro
3.9 MWWithdrawn / abandoned Penobscot, MEISO-NE Mar 2011target 2012

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)