United States › Grid › Interconnection queues › Massachusetts

GAS · ISO-NE

Combined Cycle Increase

Combined Cycle Increase is a 20.2 MW gas request withdrawn in the ISO-NE interconnection queue, in Berkshire County, Massachusetts.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Jan 2011 (completed)
  2. Withdrawn / abandonedFeb 2011 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
354
Grid region
ISO-NE (New England)
Connection point (POI)
WMECO Doreen 19A Substation
Location
Berkshire County, Massachusetts
Technology
Gas: 20.2 MW · Oil
Total requested
20.2 MW
Service type
Network resource (NRIS)
Queue status
Withdrawn
Entered queue
12 January 2011
Proposed online date
April 2011
Withdrawn
February 2011

Location

Marker shows the centre of Berkshire County; the queue data does not give exact sites.

Power plants in Massachusetts · Transmission lines in Massachusetts

Other requests in Berkshire County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem