OCTARY USA Β· INTERCONNECTION QUEUES

Withdrawn queue requests in ISO-NE (New England) (2010 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown121,337 MW
Active in queue0.0 MW0 requests
Agreement signed0.0 MW0 requests
Withdrawn121,337 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

12 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Wind
Onshore wind
536 MWWithdrawn / abandoned Washington, RIISO-NE Feb 2010target 2015
Exciter Upgrades
Gas
492 MWWithdrawn / abandoned Providence, RIISO-NE Jun 2010target 2011
Wind
Onshore wind
92.3 MWWithdrawn / abandoned Washington, MEISO-NE Nov 2010target 2015
Wind
Onshore wind
48.0 MWWithdrawn / abandoned Penobscot, MEISO-NE May 2010target 2016
Fair Haven Biomass
Other
33.0 MWWithdrawn / abandoned Rutland, VTISO-NE May 2010target 2016
Biomass
Other
33.0 MWWithdrawn / abandoned Bennington, VTISO-NE Jun 2010target 2013
Wind
Onshore wind
30.0 MWWithdrawn / abandoned Hampden, MAISO-NE May 2010target 2012
Solar
Solar
19.9 MWWithdrawn / abandoned Hampden, MAISO-NE Apr 2010target 2012
Biomass
Other
18.1 MWWithdrawn / abandoned Hancock, MEISO-NE May 2010target 2012
Wind
Onshore wind
18.0 MWWithdrawn / abandoned Hillsborough, NHISO-NE May 2010target 2013
Wind
Onshore wind
14.9 MWWithdrawn / abandoned Barnstable, MAISO-NE Dec 2010target 2012
Douglas Woods Wind Unit 12
Onshore wind
2.5 MWWithdrawn / abandoned Worcester, MAISO-NE May 2010target 2014

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)