United States βΊ Grid βΊ Interconnection queues
OCTARY USA Β· INTERCONNECTION QUEUESWithdrawn queue requests in ISO-NE (New England) (2010 requests)
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Wind Onshore wind |
536 MW | Withdrawn / abandoned |
| Exciter Upgrades Gas |
492 MW | Withdrawn / abandoned |
| Wind Onshore wind |
92.3 MW | Withdrawn / abandoned |
| Wind Onshore wind |
48.0 MW | Withdrawn / abandoned |
| Fair Haven Biomass Other |
33.0 MW | Withdrawn / abandoned |
| Biomass Other |
33.0 MW | Withdrawn / abandoned |
| Wind Onshore wind |
30.0 MW | Withdrawn / abandoned |
| Solar Solar |
19.9 MW | Withdrawn / abandoned |
| Biomass Other |
18.1 MW | Withdrawn / abandoned |
| Wind Onshore wind |
18.0 MW | Withdrawn / abandoned |
| Wind Onshore wind |
14.9 MW | Withdrawn / abandoned |
| Douglas Woods Wind Unit 12 Onshore wind |
2.5 MW | Withdrawn / abandoned |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- West (non-ISO utilities)302 Β· 22.6 GW
- PJM (Mid-Atlantic, Midwest)361 Β· 21.6 GW
- CAISO (California)168 Β· 19.1 GW
- Southeast (non-ISO utilities)18 Β· 11.1 GW
- MISO (Midcontinent)72 Β· 10.9 GW
- SPP (Southwest Power Pool)50 Β· 9,058 MW
- ERCOT (Texas)28 Β· 3,689 MW
- ISO-NE (New England)12 Β· 1,337 MW
- NYISO (New York)5 Β· 1,285 MW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)