Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- ERCOT (Texas)45 Β· 8,523 MW
- West (non-ISO utilities)51 Β· 4,751 MW
- Southeast (non-ISO utilities)40 Β· 3,879 MW
- PJM (Mid-Atlantic, Midwest)56 Β· 2,456 MW
- CAISO (California)8 Β· 2,157 MW
- MISO (Midcontinent)15 Β· 1,749 MW
- ISO-NE (New England)28 Β· 919 MW
- NYISO (New York)28 Β· 890 MW
- SPP (Southwest Power Pool)1 Β· 230 MW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)