Completed queue projects in ISO-NE (New England) (2018 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown28919 MW
Active in queue1,661 MW5 requests
Agreement signed834 MW4 requests
Withdrawn848,151 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

28 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Wallingford GT Uprate
Gas
350 MWOperating New Haven, CTISO-NE Apr 2018target 2022
Cranberry Point Energy Storage
Battery storage
150 MWOperating Plymouth, MAISO-NE Mar 2018target 2025
Downeast Wind
Onshore wind
126 MWOperating Washington, MEISO-NE Apr 2018target 2024
CPV Towantic incremental
Gas
45.0 MWOperating New Haven, CTISO-NE Sep 2018target 2020
Solar
Solar
26.4 MWOperating Hartford, CTISO-NE Feb 2018target 2019
Crystal Lake Substation - NG Western MA Area Cluster Study
Solar
24.7 MWOperating Worcester, MAISO-NE Dec 2018target 2020
Fusion Solar Center
Solar
20.0 MWOperating New London, CTISO-NE Feb 2018target 2018
Solar
Solar
19.8 MWOperating Litchfield, CTISO-NE Feb 2018target 2024
Solar
Solar
17.7 MWOperating New London, CTISO-NE Feb 2018target 2023
Solar
Solar
15.0 MWOperating New London, CTISO-NE Feb 2018target 2022
Wendell Depot Substation - NG Western MA Area Cluster Study
Solar
15.0 MWOperating Franklin, MAISO-NE Dec 2018target 2021
Wallingford Solar
Solar
15.0 MWOperating New Haven, CTISO-NE Mar 2018target 2020
Solar
Solar
10.0 MWOperating Providence, RIISO-NE May 2018target 2019
Solar
Solar
10.0 MWOperating New London, CTISO-NE Feb 2018target 2024
Solar with Battery
Solar + storage
10.0 MWOperating Worcester, MAISO-NE Sep 2018target 2021
Solar
Solar
9.5 MWOperating Plymouth, MAISO-NE Jan 2018target 2019
N. Oxford Substation - NG Western MA Area Cluster Study
Solar
8.7 MWOperating Worcester, MAISO-NE Dec 2018target 2020
Belchertown Substation - NG Western MA Area Cluster Study
Solar
8.0 MWOperating Hampden, MAISO-NE Dec 2018target 2021
Combined Reciprocating, Solar and Battery
Solar + storage
7.8 MWOperating Middlesex, MAISO-NE Aug 2018target 2019
Kearsarge Solar with battery
Solar + storage
5.4 MWOperating Norfolk, MAISO-NE Aug 2018target 2021
Solar
Solar
4.9 MWOperating Plymouth, MAISO-NE Aug 2018target 2019
Westminster - NG Western MA Area Cluster Study
Solar
4.9 MWOperating Worcester, MAISO-NE Dec 2018target 2021
Chestnut Hill 702 Substation - NG Western MA Area Cluster Study
Solar
3.3 MWOperating Worcester, MAISO-NE Dec 2018target 2020
Five Corners Substation - NG Western MA Area Cluster Study
Solar
3.0 MWOperating Hampshire, MAISO-NE Dec 2018target 2021
Vernon Station Incremental Capacity Increase
Hydro
2.9 MWOperating Windham, VTISO-NE Apr 2018target 2019
Leicester - NG Western MA Area Cluster Study
Solar
2.6 MWOperating Worcester, MAISO-NE Dec 2018target 2021
Solar
Solar
1.9 MWOperating Bristol, MAISO-NE Jan 2018target 2020
Solar with battery addition
Solar + storage
1.3 MWOperating Hampshire, MAISO-NE Jun 2018target 2019

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)