OCTARY USA Β· INTERCONNECTION QUEUESProjects with signed interconnection agreements in ISO-NE (New England) (2021 requests)
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| SouthCoast Wind 1 Offshore wind |
1,200 MW | Agreement signed |
| Battery Storage Battery storage |
508 MW | Agreement signed |
| Lite Brite Battery Storage Battery storage |
306 MW | Agreement signed |
| Hecate Energy Eastern Ave Energy Center Battery storage |
250 MW | Agreement signed |
| Naugatuck Avenue Battery Storage Battery storage |
205 MW | Agreement signed |
| Battery Storage Battery storage |
205 MW | Agreement signed |
| Norman Street Battery Storage Battery storage |
204 MW | Agreement signed |
| Green Apple Solar Solar |
179 MW | Agreement signed |
| Solar Solar |
165 MW | Agreement signed |
| Broadleaf Solar Solar |
101 MW | Agreement signed |
| Husky Solar Solar |
50.2 MW | Agreement signed |
| Solar Knox Solar |
33.5 MW | Agreement signed |
| Nutes Solar Solar |
20.0 MW | Agreement signed |
| Turner Meadow Solar Solar |
19.8 MW | Agreement signed |
| Twin Energy Wind Onshore wind |
18.3 MW | Agreement signed |
| Battery addition Other |
6.7 MW | Agreement signed |
| Roxbury Solar Solar |
2.0 MW | Agreement signed |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- CAISO (California)68 Β· 35.4 GW
- ERCOT (Texas)91 Β· 16.3 GW
- West (non-ISO utilities)55 Β· 11.7 GW
- ISO-NE (New England)17 Β· 3,473 MW
- SPP (Southwest Power Pool)19 Β· 3,459 MW
- Southeast (non-ISO utilities)12 Β· 1,908 MW
- MISO (Midcontinent)8 Β· 1,055 MW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)