Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Township Power Bank Battery storage |
50.5 MW | In study |
| Verbena Energy Storage Battery storage |
50.5 MW | In study |
| Willow Springs Solar 3 Battery storage |
50.0 MW | Agreement signed |
| Kifer BESS 1 Battery storage |
50.0 MW | In study |
| Solar Star 4 Solar + storage |
50.0 MW | Agreement signed |
| North Johnson Energy Center Battery storage |
50.0 MW | Agreement signed |
| Chula Vista Energy Center 2 Battery storage |
50.0 MW | Agreement signed |
| Solar Star 3 Solar + storage |
50.0 MW | Agreement signed |
| Ares Nevada Battery storage |
44.0 MW | Agreement signed |
| Air Station 1 Solar + storage |
42.1 MW | In study |
| Little Bear 3 Solar + storage |
40.4 MW | Agreement signed |
| Rio Bravo Solar 1 Solar + storage |
40.0 MW | Agreement signed |
| Kettleman Solar Project (Fka Kettleman Solar Farm) Solar + storage |
40.0 MW | Agreement signed |
| Little Bear Solar 1 Solar + storage |
40.0 MW | Agreement signed |
| Little Bear Solar 2 Solar + storage |
40.0 MW | Agreement signed |
| Rio Bravo Solar 2 Solar + storage |
40.0 MW | Agreement signed |
| Pumpjack Solar I (Aka Pioneer Solar I) Solar + storage |
40.0 MW | Agreement signed |
| Crow Creek Solar 1 (Fka: Frontier Solar 1) (Fka As Scatec Westside Solar Ranch I And Stanislaus PV - Phase 1) Solar + storage |
40.0 MW | Agreement signed |
| Starlight Solar Solar + storage |
37.4 MW | Agreement signed |
| Escondido Energy Center 2 Battery storage |
33.0 MW | Agreement signed |
| Hidden Knolls BESS Battery storage |
30.8 MW | In study |
| Dynamo Solar Solar |
24.5 MW | Agreement signed |
| Agua Caliente Solar 2 Solar |
20.0 MW | In study |
| Separator Expansion Battery storage |
12.6 MW | In study |
| Lake Alpaugh Battery Storage Battery storage |
10.0 MW | Agreement signed |
| Altamont Midway LTD Onshore wind |
5.0 MW | Agreement signed |
| Lassen Lodge Hydroelectric Hydro |
4.5 MW | Agreement signed |
| Milpa Power Bank Battery storage |
3.0 MW | In study |
| Lassen Lodge Hydroelectric 2 Hydro |
0.5 MW | Agreement signed |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- West (non-ISO utilities)1,857 · 519.1 GW
- ERCOT (Texas)1,986 · 447.3 GW
- MISO (Midcontinent)1,646 · 350.1 GW
- CAISO (California)429 · 188.6 GW
- Southeast (non-ISO utilities)1,067 · 161.4 GW
- SPP (Southwest Power Pool)692 · 152.4 GW
- PJM (Mid-Atlantic, Midwest)1,248 · 140.4 GW
- NYISO (New York)190 · 27.1 GW
- ISO-NE (New England)72 · 14.6 GW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)