Agua Caliente Solar 2

Agua Caliente Solar 2 is a 20.0 MW solar request in interconnection study in the CAISO interconnection queue, in Maricopa County, Arizona, connecting to SDGE.

Queue statusIn planning
  1. PlanningQueued Mar 2016 (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingTarget Dec 2016 (not yet reached)
  5. Closed (not yet reached)

Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.

Request details

Queue ID
1222
Grid region
CAISO (California)
Utility / transmission owner
SDGE
Connection point (POI)
Hoodoo Wash Switchyard 500 kV
Location
Maricopa County, Arizona
Technology
Solar: 20.0 MW
Total requested
20.0 MW
Service type
Energy only (ERIS)
Study phase
In Progress
Queue status
Active
Entered queue
8 March 2016
Proposed online date
December 2016

Location

Marker shows the centre of Maricopa County; the queue data does not give exact sites.