| Project | Capacity | Status |
|---|---|---|
| Sengun BESS Battery storage · BRP Blue Topaz 12, LLC |
201 MW | In study |
| Cummins BESS Battery storage · RWE Solar Development, LLC |
201 MW | In study |
| Fike BESS Battery storage · BRP Blue Topaz 9, LLC |
201 MW | In study |
| Falcon Zapata Storage 138 Battery storage · Falcon BESS, LLC |
201 MW | In study |
| Augie BESS Battery storage · BRP Blue Topaz 5, LLC |
201 MW | In study |
| Rio Hondo BESS Battery storage · SBESS TX25 LLC |
201 MW | In study |
| Bobcat Cameron BESS Battery storage · Bobcat BESS, LLC |
201 MW | In study |
| Longday Solar SLF Solar + storage · Longday Solar |
201 MW | In study |
| Trelas Battery storage · Trelasol, LLC |
201 MW | In study |
| Forts Trail Solar Solar + storage · JC Central Bluff, LLC |
201 MW | In study |
| HGP Pacesetter BESS Battery storage |
201 MW | Paused / redesign |
| Stinger Energy Storage Battery storage · Stinger Energy Storage LLC |
201 MW | In study |
| Kota Battery Battery storage · Kota Storage, LLC |
201 MW | In study |
| Cash Mills Storage Center Battery storage · Mills Storage Center |
201 MW | In study |
| Zunkerville Solar Solar + storage · Zunkerville Energy, LLC |
201 MW | In study |
| Obbligato BESS Battery storage · Obbligato BESS, LLC |
201 MW | In study |
| Arpeggio BESS Battery storage · Arpeggio BESS, LLC |
201 MW | In study |
| Goby Energy Center Battery storage · Goby Energy Center |
201 MW | In study |
| Dilley Solar Solar · AETS Development Holdings LLC |
201 MW | In study |
| BremRaek BESS Battery storage · BremRaek BESS |
201 MW | In study |
| Beitel Energy Storage Battery storage · Brazos Energy Storage, LLC |
201 MW | In study |
| Blackcat Storage Battery storage · Matagorda ESS, LLC |
201 MW | In study |
| Ruedrich BESS Battery storage · Ruedrich BESS |
201 MW | In study |
| Goldhill Energy Storage Battery storage · Goldhill Energy Storage LLC |
201 MW | In study |
| Red Top Solar I Solar · Cat Red Top Solar, LLC |
201 MW | In study |
| Devine Mary BESS Battery storage · Devine Mary BESS |
201 MW | In study |
| JackGard BESS Battery storage · Jackgard BESS |
201 MW | In study |
| Vaughn Energy Storage Battery storage · Vaughn Battery Storage, LLC |
201 MW | In study |
| Grandview 4 Phase A Wind Onshore wind |
201 MW | Paused / redesign |
| Englehardt BESS Battery storage · Comal BESS LLC |
201 MW | In study |
| Barbara BESS Battery storage · Barbara BESS LLC |
201 MW | In study |
| Onshore wind project J3391, Coles County Onshore wind |
200 MW | In study |
| Reunion Storage Solar + storage · Reunion Solar, LLC |
200 MW | In study |
| Sagebrush Wind Onshore wind · ACE DevCo NC, LLC |
200 MW | In study |
| Triangle Ranch Bravo Onshore wind · Triangle Ranch Wind |
200 MW | In study |
| Triangle Ranch Charlie Onshore wind |
200 MW | Paused / redesign |
| Texas Solar Nova 3 Solar · Texas Solar Nova 1, LLC |
200 MW | In study |
| Solar project J2845, Freeborn County Solar |
200 MW | In study |
| Rueter Solar Solar |
200 MW | Paused / redesign |
| Solar project 957146, Newberry County Solar |
200 MW | In study |
| Other project GEN-2025-SR25, Tulsa County Other |
200 MW | In study |
| Battery storage project S0037, Emery County Battery storage |
200 MW | In study |
| Surplus; J1190 Battery storage |
200 MW | In study |
| Pepper Hammock Solar Solar |
200 MW | In study |
| Solar + storage project Q424, Navajo County Solar + storage |
200 MW | In study |
| Battery storage project J1895, Kenosha County Battery storage |
200 MW | In study |
| Solar project 512, Lee County Solar |
200 MW | In study |
| Gemma Energy Storage Battery storage · Hanwha Q CELLS USA Corp. |
200 MW | In study |
| Solar project J3039, Olmsted County Solar |
200 MW | In study |
| Solar project AH2-397, Somerset County Solar |
200 MW | In study |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- West (non-ISO utilities)1,496 · 455.6 GW
- ERCOT (Texas)1,408 · 328.0 GW
- MISO (Midcontinent)1,337 · 302.2 GW
- Southeast (non-ISO utilities)815 · 118.5 GW
- SPP (Southwest Power Pool)480 · 114.8 GW
- PJM (Mid-Atlantic, Midwest)905 · 105.4 GW
- CAISO (California)194 · 92.4 GW
- NYISO (New York)190 · 27.1 GW
- ISO-NE (New England)27 · 6,015 MW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)