United States › Grid › Interconnection queues
OCTARY USA · INTERCONNECTION QUEUESQueue requests in study in the USA (2021 requests) — page 5
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Goodalta Solar Solar · GoodAlta Power Center LLC |
221 MW | In study |
| Battery storage project Q83, Millard County Battery storage · Intermountain Power Agency |
220 MW | In study |
| Solar project J2001, Newaygo County Solar |
220 MW | In study |
| Gas project 113, Lewis County Gas |
219 MW | Paused / redesign |
| Gas project 114, Kitsap County Gas |
215 MW | Paused / redesign |
| Weston Storage Battery storage |
214 MW | In study |
| Frigatebird Storage Battery storage |
214 MW | In study |
| Val Vista Grid BESS 2 Battery storage · Val Vista Grid, LLC |
211 MW | In study |
| Two Rivers Solar Solar · Two Rivers Solar, LLC |
209 MW | In study |
| Alwest BESS Battery storage · Castleman Power |
209 MW | In study |
| Umbra (Stockyard) Solar Solar |
208 MW | Paused / redesign |
| Liberty Senate Energy Storage 1 Battery storage · Senate Solar LLC |
207 MW | In study |
| Alamosa Storage Battery storage |
207 MW | Paused / redesign |
| BRP Hemera BESS Battery storage · BRP Hemera BESS LLC |
207 MW | In study |
| Sultan Solar Solar |
206 MW | Paused / redesign |
| Crios BESS Battery storage · BRP Crios BESS LLC |
206 MW | In study |
| Trivor BESS Battery storage · BRP Trivor BESS LLC |
206 MW | In study |
| BRP Triton BESS Battery storage · BRP Triton BESS LLC |
205 MW | In study |
| Utica Solar Solar |
205 MW | Paused / redesign |
| Cornwall Solar Solar |
205 MW | Paused / redesign |
| Phaenon Solar + storage |
204 MW | In study |
| Puma Storage Battery storage |
204 MW | In study |
| Marcelina Storage Battery storage · Marcelina Solar, LLC |
203 MW | In study |
| Onshore wind project GEN-2021-025, Woodward County Onshore wind |
203 MW | In study |
| Masroor Storage Other · Masroor Energy Storage LLC |
203 MW | Paused / redesign |
| Bee Branch IA Battery storage · Tidwell Prairie LLC |
203 MW | In study |
| Sanjac BESS Battery storage · Castleman Power |
202 MW | In study |
| BRP Nile BESS Battery storage · BRP Nile BESS LLC |
202 MW | In study |
| Everest Energy Storage Battery storage |
202 MW | In study |
| Solar project GEN-2021-107, Pottawatomie County Solar |
202 MW | In study |
| Snap Jaw BESS Other · Moccasin Pointe Grid, LLC |
201 MW | Paused / redesign |
| Tucana BESS Battery storage · BRP Tucana BESS LLC |
201 MW | In study |
| Outer Loop BESS Battery storage · Black Mountain Energy Storage II |
201 MW | In study |
| Zelus BESS Battery storage · BRP Zelus BESS LLC |
201 MW | In study |
| Kota Battery Battery storage · Kota Storage, LLC |
201 MW | In study |
| Solar + storage project Q424, Navajo County Solar + storage |
200 MW | In study |
| Battery storage project 101, King County Battery storage |
200 MW | Paused / redesign |
| Onshore wind project J2080, Oliver County Onshore wind |
200 MW | In study |
| Battery storage project Q81, Los Angeles County Battery storage |
200 MW | In study |
| Solar project IC-990, Toombs County Solar |
200 MW | Paused / redesign |
| Solar project J2061, Saginaw County Solar |
200 MW | In study |
| Solar + storage project Company 208, Clark County Solar + storage |
200 MW | Paused / redesign |
| Battery storage project 21-103, Clackamas County Battery storage |
200 MW | In study |
| Onshore wind project G0671, Walla Walla County Onshore wind |
200 MW | In study |
| Solar project J2289, Sunflower County Solar |
200 MW | In study |
| Battery storage project 625, Jerome County Battery storage · Gem Vale Energy Storage LLC |
200 MW | Paused / redesign |
| Onshore wind project J1867, Franklin County Onshore wind |
200 MW | In study |
| Solar project J2089, Mississippi County Solar |
200 MW | In study |
| Battery storage project 109, Kitsap County Battery storage |
200 MW | Paused / redesign |
| Solar + storage project Company LD, Lander County Solar + storage |
200 MW | Paused / redesign |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- West (non-ISO utilities)172 · 56.8 GW
- CAISO (California)70 · 31.5 GW
- ERCOT (Texas)116 · 23.2 GW
- MISO (Midcontinent)126 · 22.4 GW
- Southeast (non-ISO utilities)44 · 9,966 MW
- SPP (Southwest Power Pool)25 · 5,570 MW
- PJM (Mid-Atlantic, Midwest)49 · 2,072 MW
- NYISO (New York)11 · 991 MW
- ISO-NE (New England)3 · 525 MW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)