United States › Grid › Interconnection queues › Massachusetts
OCTARY USA · INTERCONNECTION QUEUESWithdrawn queue requests in Massachusetts — page 5
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Solar Solar |
19.9 MW | Withdrawn / abandoned |
| Battery Storage Battery storage |
19.7 MW | Withdrawn / abandoned |
| Battery Storage Battery storage |
19.7 MW | Withdrawn / abandoned |
| Eversource Group @ Wing Lane 624 Solar + storage |
19.0 MW | Withdrawn / abandoned |
| Battery Storage Battery storage |
18.9 MW | Withdrawn / abandoned |
| Group @ Hatchville 936 - EMA ASO Solar + storage |
18.5 MW | Withdrawn / abandoned |
| Palmer Substation - NG Western MA Area Cluster Study Solar |
18.1 MW | Withdrawn / abandoned |
| Mirant Kendall Jet 2 Other |
18.0 MW | Withdrawn / abandoned |
| Group @ Medway 65 - EMA ASO Solar + storage |
17.5 MW | Withdrawn / abandoned |
| W. Charlton substation - NG Western MA Area Cluster Study Solar |
17.0 MW | Withdrawn / abandoned |
| EE 2024 SEMA/Cape ASO Group Study Solar + storage |
16.9 MW | Withdrawn / abandoned |
| Group @ Industrial Park 636 - EMA ASO Solar + storage |
16.5 MW | Withdrawn / abandoned |
| Kendall Combined Cycle increase Gas |
16.4 MW | Withdrawn / abandoned |
| Group @ Wing Lane 624 - EMA ASO Solar + storage |
15.0 MW | Withdrawn / abandoned |
| Wind Onshore wind |
14.9 MW | Withdrawn / abandoned |
| Pratts Junc. Substation - NG WMA Group 3 Battery storage |
14.9 MW | Withdrawn / abandoned |
| Lashaway Substation - NG WMA Group 3 Battery storage |
14.9 MW | Withdrawn / abandoned |
| Millbury substation - NG Western MA Area Cluster Study Solar |
14.4 MW | Withdrawn / abandoned |
| Meadow Street 552 Substation - NG WMA Group 3 Solar + storage |
13.8 MW | Withdrawn / abandoned |
| Lashaway Substation - NG Western MA Area Cluster Study Solar |
13.7 MW | Withdrawn / abandoned |
| Meadow Street 552 Substation - NG Western MA Area Cluster Study Solar |
13.4 MW | Withdrawn / abandoned |
| Ware Substation - NG Western MA Area Cluster Study Solar |
13.3 MW | Withdrawn / abandoned |
| West Hampden 139 substation - NG Western MA Area Cluster Study Solar |
13.2 MW | Withdrawn / abandoned |
| HGE Group Study Battery storage |
13.0 MW | Withdrawn / abandoned |
| MATEP - Third CTG Gas |
12.5 MW | Withdrawn / abandoned |
| Eversource Group Study @ Blandford Solar |
12.5 MW | Withdrawn / abandoned |
| Barre Substation - NG WMA Group 3 Solar + storage |
12.4 MW | Withdrawn / abandoned |
| Thorndike Substation - NG Western MA Area Cluster Study Solar |
12.4 MW | Withdrawn / abandoned |
| Barre substation - NG Western MA Area Cluster Study Solar |
12.4 MW | Withdrawn / abandoned |
| Eversource Group @ Bell Rock #661 Solar + storage |
12.0 MW | Withdrawn / abandoned |
| Combustion Turbine Gas |
12.0 MW | Withdrawn / abandoned |
| AWT Fitchburg Wind Project Onshore wind |
12.0 MW | Withdrawn / abandoned |
| Battery Storage Battery storage |
11.9 MW | Withdrawn / abandoned |
| Eversource Group @ Sandwich 916 Solar + storage |
11.8 MW | Withdrawn / abandoned |
| Millbury Substation - NG WMA Group 3 Solar + storage |
11.7 MW | Withdrawn / abandoned |
| Eversource Group Study @ Industrial Park Solar + storage |
11.3 MW | Withdrawn / abandoned |
| Ware Substation - NG WMA Group 3 Solar + storage |
11.0 MW | Withdrawn / abandoned |
| Adams substation - NG Western MA Area Cluster Study Solar |
11.0 MW | Withdrawn / abandoned |
| Internal Combustion Other |
10.0 MW | Withdrawn / abandoned |
| Treasure Valley Substation - NG WMA Group 3 Battery storage |
10.0 MW | Withdrawn / abandoned |
| Solar + Battery Storage Solar + storage |
10.0 MW | Withdrawn / abandoned |
| Group @ Orleans 975 - EMA ASO Solar + storage |
10.0 MW | Withdrawn / abandoned |
| NG DG @ Sykes Road Battery storage |
10.0 MW | Withdrawn / abandoned |
| Battery Storage Battery storage |
10.0 MW | Withdrawn / abandoned |
| RMLD DER Group Study Battery storage |
10.0 MW | Withdrawn / abandoned |
| NG NEMA Group DER Study Battery storage |
10.0 MW | Withdrawn / abandoned |
| Battery Storage Battery storage |
10.0 MW | Withdrawn / abandoned |
| Eversource Group @ Valley 715 Solar + storage |
10.0 MW | Withdrawn / abandoned |
| Group @ Montigue - WMA ASO Solar + storage |
9.9 MW | Withdrawn / abandoned |
| Eversource Group Study @ Brook St Solar + storage |
9.8 MW | Withdrawn / abandoned |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)