Mirant Kendall Jet 2

Mirant Kendall Jet 2 is a 18.0 MW other request withdrawn in the ISO-NE interconnection queue, in Middlesex County, Massachusetts, connecting to NSTAR.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Jul 2006 (completed)
  2. Withdrawn / abandonedJul 2009 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
163
Grid region
ISO-NE (New England)
Utility / transmission owner
NSTAR
Connection point (POI)
Kendall Station in Cambridge
Location
Middlesex County, Massachusetts
Technology
Oil: 18.0 MW
Total requested
18.0 MW
Service type
Other
Study phase
System Impact Study
Queue status
Withdrawn
Entered queue
24 July 2006
Proposed online date
January 2010
Withdrawn
July 2009

Location

Marker shows the centre of Middlesex County; the queue data does not give exact sites.

Power plants in Massachusetts · Transmission lines in Massachusetts

Other requests in Middlesex County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem