West Hampden 139 substation - NG Western MA Area Cluster Study

West Hampden 139 substation - NG Western MA Area Cluster Study is a 13.2 MW solar request withdrawn in the ISO-NE interconnection queue, in Hampden County, Massachusetts, connecting to NGRID.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Mar 2019 (completed)
  2. Withdrawn / abandonedJun 2025 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
865
Grid region
ISO-NE (New England)
Utility / transmission owner
NGRID
Connection point (POI)
NG West Hampden substation
Location
Hampden County, Massachusetts
Technology
Solar: 13.2 MW
Total requested
13.2 MW
Queue status
Withdrawn
Entered queue
21 March 2019
Proposed online date
March 2023
Withdrawn
June 2025

Location

Marker shows the centre of Hampden County; the queue data does not give exact sites.

Power plants in Massachusetts · Transmission lines in Massachusetts

Other requests in Hampden County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem