United States › Grid › Interconnection queues
OCTARY USA · INTERCONNECTION QUEUESWithdrawn queue requests in the USA — page 460
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Solar + storage project AG1-077, Magoffin County Solar + storage |
3.7 MW | Withdrawn / abandoned |
| San Ysidro Energy Storage Battery storage |
3.7 MW | Withdrawn / abandoned |
| Solar project AG2-205, Huntingdon County Solar |
3.7 MW | Withdrawn / abandoned |
| Valley 715 - EMA ASO Solar + storage |
3.7 MW | Withdrawn / abandoned |
| EE CT DER Group Study Solar |
3.7 MW | Withdrawn / abandoned |
| Frates Battery storage |
3.7 MW | Withdrawn / abandoned |
| BE-Chalybeate Solar + storage |
3.7 MW | Withdrawn / abandoned |
| BR-Mountain View Solar + storage |
3.7 MW | Withdrawn / abandoned |
| Solar project AH1-006, Essex County Solar |
3.7 MW | Withdrawn / abandoned |
| Coyote Ranch Energy Storage Battery storage |
3.7 MW | Withdrawn / abandoned |
| Onshore wind project C3-091, Albany County Onshore wind · PacifiCorp |
3.6 MW | Withdrawn / abandoned |
| Geothermal project C4-001, Beaver County Geothermal |
3.6 MW | Withdrawn / abandoned |
| Solar plus Battery Solar + storage |
3.6 MW | Withdrawn / abandoned |
| Solar project V4-066, Atlantic County Solar |
3.6 MW | Withdrawn / abandoned |
| Other project AA1-063, Randolph County Other |
3.6 MW | Withdrawn / abandoned |
| Onshore wind project GI-0914, Lyon County Onshore wind |
3.6 MW | Withdrawn / abandoned |
| Hydro project 344, Fremont County Hydro |
3.6 MW | Withdrawn / abandoned |
| Other project Q27, Maricopa County Other |
3.6 MW | Withdrawn / abandoned |
| Solar project AE2-002, Prince George's County Solar |
3.6 MW | Withdrawn / abandoned |
| Solar project AA1-096, Washington County Solar |
3.5 MW | Withdrawn / abandoned |
| Solar project AA1-093, Washington County Solar |
3.5 MW | Withdrawn / abandoned |
| Solar project V4-017, Sussex County Solar |
3.5 MW | Withdrawn / abandoned |
| Battery storage project AF2-098, Grant County Battery storage |
3.5 MW | Withdrawn / abandoned |
| Kenyon Substation - NG Western RI DG Area Study Solar |
3.5 MW | Withdrawn / abandoned |
| Solar project AE2-016, Burlington County Solar |
3.5 MW | Withdrawn / abandoned |
| Hopkins Hill - NG WRI DG Area Study #2 <5 MW Solar |
3.5 MW | Withdrawn / abandoned |
| Battery storage project Z2-093, Hunterdon County Battery storage |
3.5 MW | Withdrawn / abandoned |
| Geothermal project 285, Gem County Geothermal |
3.5 MW | Withdrawn / abandoned |
| Other project Q67, Cook County Other |
3.5 MW | Withdrawn / abandoned |
| Solar project Y1-042, Cumberland County Solar |
3.5 MW | Withdrawn / abandoned |
| Falmouth 933 - EMA ASO Solar + storage |
3.5 MW | Withdrawn / abandoned |
| Other project 236, Canyon County Other |
3.5 MW | Withdrawn / abandoned |
| Other project Q67B, Cook County Other |
3.5 MW | Withdrawn / abandoned |
| Gas project AF2-160, Allegheny County Gas |
3.5 MW | Withdrawn / abandoned |
| Solar project AA1-080, Washington County Solar |
3.5 MW | Withdrawn / abandoned |
| Solar project AA1-068, Washington County Solar |
3.5 MW | Withdrawn / abandoned |
| Solar project AE2-105, Sussex County Solar |
3.5 MW | Withdrawn / abandoned |
| Solar project AE2-018, Mercer County Solar |
3.5 MW | Withdrawn / abandoned |
| Solar project Y1-081, Talbot County Solar |
3.4 MW | Withdrawn / abandoned |
| Hydro project 450, Lewis And Clark County Hydro |
3.4 MW | Withdrawn / abandoned |
| Gas project Y3-113, Wyoming County Gas |
3.4 MW | Withdrawn / abandoned |
| Bath 115 kV SS - Midcoast Area DG Study Solar |
3.4 MW | Withdrawn / abandoned |
| Camptonville Biopower Other |
3.4 MW | Withdrawn / abandoned |
| Greenville Solar Solar |
3.4 MW | Withdrawn / abandoned |
| Onshore wind project GEN-2016-054, Jerauld County Onshore wind |
3.4 MW | Withdrawn / abandoned |
| Onshore wind project 318, Meagher County Onshore wind |
3.3 MW | Withdrawn / abandoned |
| Solar project AB1-032, Athens County Solar |
3.3 MW | Withdrawn / abandoned |
| Solar project 679, Iron County Solar |
3.3 MW | Withdrawn / abandoned |
| Onshore wind project M13, Lee County Onshore wind |
3.3 MW | Withdrawn / abandoned |
| Onshore wind project 319, Meagher County Onshore wind |
3.3 MW | Withdrawn / abandoned |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- West (non-ISO utilities)5,277 · 949.5 GW
- PJM (Mid-Atlantic, Midwest)5,226 · 638.1 GW
- MISO (Midcontinent)3,261 · 621.9 GW
- CAISO (California)2,186 · 619.9 GW
- Southeast (non-ISO utilities)2,738 · 603.3 GW
- SPP (Southwest Power Pool)1,846 · 382.9 GW
- NYISO (New York)1,531 · 324.1 GW
- ERCOT (Texas)1,158 · 262.0 GW
- ISO-NE (New England)982 · 118.1 GW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)