United States βΊ Grid βΊ Interconnection queues βΊ Maryland
SOLAR Β· PJMSolar project Y1-081, Talbot County
Solar project Y1-081, Talbot County is a 3.4 MW solar request withdrawn in the PJM interconnection queue, in Talbot County, Maryland, connecting to DPL.
Queue statusWithdrawn / abandoned
- PlanningQueued Apr 2012 (completed)
- Withdrawn / abandonedSep 2012 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- Y1-081
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- DPL
- Connection point (POI)
- Wye Mills 12kV
- Location
- Talbot County, Maryland
- Technology
- Solar: 3.4 MW
- Total requested
- 3.4 MW
- Service type
- Network resource (NRIS)
- Study phase
- Available studies: Feasibility Study
- Queue status
- Withdrawn
- Entered queue
- 30 April 2012
- Proposed online date
- November 2013
- Withdrawn
- September 2012
Location
Marker shows the centre of Talbot County; the queue data does not give exact sites.
Other requests in Talbot County
- Wye Mills Solar SiteSolar Β· 10.0 MW Β· built
- Easton Utilities Substation 2Gas Β· 5.0 MW Β· built
- Easton Utilities Substation 2Gas Β· 5.0 MW Β· built
- Crockett Solar ProjectSolar Β· 44.0 MW Β· withdrawn
- Solar project AA1-143, Talbot CountySolar Β· 20.0 MW Β· withdrawn
- Battery storage project AG2-379, Talbot CountyBattery storage Β· 20.0 MW Β· withdrawn
- Crockett Solar ProjectSolar Β· 15.0 MW Β· withdrawn
- Solar project AA2-150, Talbot CountySolar Β· 10.0 MW Β· withdrawn
- Battery storage project AC1-224, Talbot CountyBattery storage Β· 1.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem