United States βΊ Grid βΊ Interconnection queues βΊ Maryland
BATTERY STORAGE Β· PJMBattery storage project AG2-379, Talbot County
Battery storage project AG2-379, Talbot County is a 20.0 MW battery storage request withdrawn in the PJM interconnection queue, in Talbot County, Maryland, connecting to DPL.
Queue statusWithdrawn / abandoned
- PlanningQueued Mar 2021 (completed)
- Withdrawn / abandonedJul 2025 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- AG2-379
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- DPL
- Developer
- Crockett Solar I, LLC
- Connection point (POI)
- Easton - Steele 138 kV III
- Location
- Talbot County, Maryland
- Technology
- Battery: 20.0 MW
- Total requested
- 20.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- In Progress (unknown study)
- Queue status
- Withdrawn
- Entered queue
- 29 March 2021
- Proposed online date
- September 2023
- Withdrawn
- July 2025
Location
Marker shows the centre of Talbot County; the queue data does not give exact sites.
Other requests in Talbot County
- Wye Mills Solar SiteSolar Β· 10.0 MW Β· built
- Easton Utilities Substation 2Gas Β· 5.0 MW Β· built
- Easton Utilities Substation 2Gas Β· 5.0 MW Β· built
- Crockett Solar ProjectSolar Β· 44.0 MW Β· withdrawn
- Solar project AA1-143, Talbot CountySolar Β· 20.0 MW Β· withdrawn
- Crockett Solar ProjectSolar Β· 15.0 MW Β· withdrawn
- Solar project AA2-150, Talbot CountySolar Β· 10.0 MW Β· withdrawn
- Solar project Y1-081, Talbot CountySolar Β· 3.4 MW Β· withdrawn
- Battery storage project AC1-224, Talbot CountyBattery storage Β· 1.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem